1. All uses shall have vehicular access to an arterial or collector road as identified in the Dover Township Comprehensive Plan.
2. Minimum lot size shall be two acres.
3. All structures shall be located at least 150 feet from all property lines, unless setback further by standards the underlying zoning.
4. Maximum lot coverage shall be 60%.
5. A minimum buffer strip shall be provided along all property lines in accordance with Section 409.
6. All outside storage of raw material shall be completely enclosed by an eight-foot-high fence and screened from adjoining properties and roads. No outdoor storage is permitted within the required buffer strip.
7. All storage facilities, conveying apparatuses, drying or wetting chambers and axial ventilation fans shall be set back a minimum of 150 feet from all property lines.
8. Operational Requirements.
A. Machinery, Equipment and Operations. All machinery, equipment and materials used in refining; all processing and manufacturing operations; and all hauling of refined products must be maintained, operated, or conducted in such a manner that:
(1) Flying objects and debris are not thrown.
(2) Noxious gases are not disseminated.
(3) There is no appreciable noise, vibration, dust, or mist.
(Ord. 2024-01, 5/13/2024)