Fees, fines, and penalties applicable to the provisions of the Chicago Construction Codes listed in Table 14A-12-1203.2 are as provided in that table. Each violation and each day that a violation continues is a separate and distinct offense.
Section
|
Description
|
Amount
|
Section
|
Description
|
Amount
|
First violation | $500 min. $1,000 max. | |
Second violation | $1,000 min. $3,000 max. | |
Third or subsequent violation | $3,000 min. $5,000 max. | |
Violation not resulting in the death or injury of a natural person | $1,000 min. $10,000 max. | |
Violation resulting in the death or injury of a natural person | $10,000 min. (no max.) | |
Violation within an owner-occupied dwelling unit a | $500 min. $1,000 max. | |
Any other violation | $1,000 min. $2,000 max. | |
a. Before January 1, 2033, the owner of an owner-occupied dwelling unit with all required fully functioning smoke alarms may not be fined for installing a fully functioning battery-powered smoke alarm that does not comply with the additional technical requirements of Section 14X-5-504.8.4.
(Amend Coun. J. 2-26-21, p. 28049, § 2)
Fees applicable to the provisions of Chapter 4, other than permit fees and stop work order fees, are as provided in Table 14A-12-1204.1.
Section
|
Description
| Amount a |
Section
|
Description
| Amount a |
Monthly electrical maintenance permit (per building, per 30 days) | $75 | |
Monthly plumbing maintenance permit (per building, per 30 days) | $75 | |
Accessibility pre-review first hour additional hour or portion of an hour | $300 $200 | |
Pre-permit debt check (per request) | $30 | |
Stand-alone permit review fee | $25 | |
Permit fee deposit | $300 | |
Extension of time or reinstatement (per permit, per 180-day period) | 25% of original permit fee | |
a. Fees specified in this table are nonrefundable.
(Amend Coun. J. 10-7-20, p. 21791, Art. I, § 21; Amend Coun. J. 12-14-22, p. 58278, Art. II, § 14; Amend Coun. J. 11-15-23, p. 6700, Art. VII, § 1)
Stand-alone permit fees and permit fee factors applicable to Section 14A-4-412.1 are as provided in Table 14A-12-1204.2.
Category of Work
|
Scope of Work
|
Drawings required
|
Zoning fee required
|
Permit fee
|
Category of Work
|
Scope of Work
|
Drawings required
|
Zoning fee required
|
Permit fee
|
Administrative issues | Change of owner or contractor, extension of time, permit reinstatement g | No | No | $75 per permit number |
Filing deferred submittal documents c | Yes | No | $500 | |
Filing post-construction compliance documentation required by Title 14N c | No | No | $50 | |
Reprint permit (except self-service) | No | No | $25 | |
Alteration | Interior alteration up to 500 square feet in floor area, with no change of occupancy and no change to load- bearing elements or means of egress | Yes a | Yes | $250 |
Interior alteration up to 2,000 square feet in floor area within single dwelling unit or tenant space, with no change of occupancy and no change to load- bearing elements or means of egress | Yes a | Yes | $500 | |
Communication equipment c | Antenna, monopole, or satellite dish for commercial use | Yes | Yes | $750 |
Installation or alteration of cell phone tower equipment box | Yes | Yes | $750 per box | |
Installation or alteration of cell phone antennas | Yes | Yes | $750 per tower | |
Repair | No | No | $175 per location | |
Construction equipment c | Class I or Class II crane or similar construction equipment | Yes | No | $450 each phase |
Temporary construction tower or personnel, material, or skip hoist associated with construction site | Yes | No | $750 each | |
Conveyance devices c | Automotive lift | Yes a | Yes | $200 per vehicle |
Elevator or lift serving no more than 5 levels | Yes a | No | $300 | |
Elevator or lift serving at least 6 and no more than 20 levels | Yes a | No | $300 | |
Elevator or lift serving at least 21 and no more than 30 levels | Yes a | No | $450 | |
Elevator or lift serving 31 or more levels | Yes a | No | $600 | |
Escalator or moving walk | Yes a | No | $300 | |
Major repair work or alterations (not routine maintenance) | Yes a | No | $150 per device | |
Material lift, loading or truck dock lift, or dumbwaiter | Yes a | No e | $150 | |
Mechanical amusement riding device, temporary installation - 1 device | No | No | $300 per event | |
Mechanical amusement riding device, temporary installation - 2-7 devices | No | No | $500 per event | |
Mechanical amusement riding device, temporary installation - 8-14 devices | No | No | $1,200 per event | |
Mechanical amusement riding device, temporary installation - more than 14 devices | No | No | $1,200 plus $300 per device in excess of 14 | |
Mechanical amusement riding device, other than temporary installation | No | Yes | $500 each | |
Stage or orchestra lift or specialized conveyance device | Yes a | No | $300 | |
Platform lift, inclined wheelchair lift, or stairway chairlift | Yes a | No | $150 | |
Window washer power-operated platform | Yes a | No | Same as for elevator | |
Vertical reciprocating conveyor | Yes a | No | $300 | |
Electrical | Installation of electrical service disconnecting means only, less than 400 amps | See Section 14E-2-215.5 | No | $75 |
Installation of electrical service disconnecting means only, 400 to less than 1,000 amps | No | $300 | ||
Installation of electrical service disconnecting means only, 1,000 amps or more | No | $750 | ||
Installation of low-voltage electrical system | No | $75 per system f per floor | ||
Installation of low-voltage electrical system f within or serving single dwelling unit | No | $75 per system f | ||
Installation of permanent power generator, whether required or discretionary | Yes e | $750 | ||
IInstallation of permanent power generator for residential building with 3 or fewer dwelling units (no mixed occupancy) | Yes e | $75 | ||
Installation of emergency lighting system | No | $125 | ||
Installation of electrical system for outdoor illumination per 1,000 square feet of parking lot or landscape area | No | $75 | ||
Installation of up to 10 new circuits on a single service disconnecting means | No | $150 | ||
Installation of 11 to 20 new circuits on a single service disconnecting means | No | $300 | ||
Installation of 21 to 40 new circuits on a single service disconnecting means | No | $600 | ||
Installation of 41 to 80 new circuits on a single service disconnecting means | No | $1,500 | ||
Installation of 81 new circuits or more on a single service disconnecting means | No | $2,250 | ||
Repair or alteration of devices on existing electrical circuits | No | No | $75 per service disconnecting means | |
Solar panel installation (less than 13.44 kW) with or without installation of energy storage system (up to 20 kWh) | No | Yes | $225 | |
Temporary power generators, electrical services, or service disconnecting means | No | No | $150 | |
Environmental | Asbestos removal | See Section 11-4-2170 of the Municipal Code | ||
Installation of regulated equipment h | Yes a | No e | $225 per piece | |
Sandblasting, grinding, or chemically washing any structure c | See Section 11-4-130 of the Municipal Code | |||
Fences, freestanding walls, and trash enclosures | Installation of fence up to 6 feet high, any length, any material except masonry | No | No | $150 |
Installation of fence over 6 feet high, any length, any material | Yes | Yes | $300 | |
Installation of non-masonry trash enclosure | Yes a | Yes | $150 each | |
Installation of freestanding masonry wall, any height or length | Yes a | Yes | $300 | |
Installation of masonry trash enclosure | Yes | Yes | $300 each | |
Fire b, c | New fire detection systems, voice systems, fire command panel, exit signs, special locking arrangements, or fire alarm system or other new fire safety system-related review | Yes | No | $150 per floor (minimum fee $600) |
Modification of existing fire detection systems, voice systems, fire command panel, exit signs, special locking arrangements, or fire alarm system or other existing fire safety system-related review | Yes | No | $150 per floor | |
Fire escape installation, alteration, or repair on building up to 4 stories | Yes a | Yes | $150 per fire escape | |
Fire escape installation, alteration, or repair on 5 to 7 story building | Yes a | Yes | $450 per fire escape | |
Fire escape installation, alteration, or repair on buildings over 7 stories | Yes a | Yes | $900 per fire escape | |
Masonry | Brick or other unit masonry repair, other than reconstruction | No | Yes | $300 per area up to 50,000 square feet |
Concrete repair | Yes a | Yes | $300 per area up to 5,000 square feet | |
Parapet wall reconstruction | Yes a | Yes | $200 per area up to 2,500 square feet | |
Mechanical (HVAC) | Duct extension or reconfiguration for existing ventilation or exhaust system | No | No | $75 per dwelling unit or tenant space |
Gas piping extension or reconfiguration | No | No | $75 per dwelling unit or tenant space | |
Installation of new equipment for air conditioning (individual equipment) | Yes a | No | $150 per dwelling unit or tenant space | |
Installation of new chiller, cooling tower, or air-handling equipment serving more than one dwelling unit or tenant space, with no alterations to equipment room and no other construction | Yes a | Yes | $600 | |
Installation of new refrigeration equipment to serve food cooling, not part of other construction, including associated piping | Yes a | Yes | $450 | |
Repair or in-kind replacement of heating, cooling, or air-handling equipment (individual equipment) | No | No | $75 per equipment type and per dwelling unit or tenant space | |
Repair or in-kind replacement of heating, cooling, or air-handling equipment serving more than one dwelling unit or tenant space, with no alteration to equipment room | No d | No | $300 per equipment type | |
Miscellaneous structures | Canopy or marquee, installation or alteration | Yes | Yes | $150 |
Wrecking detached private garage or carport | No | No | $125 | |
Detached private garage or carport of frame construction up to 600 square feet in building area, not more than 12 feet in building height, and without occupiable rooftop (includes electrical work and wrecking of existing private garage or carport, if any) | No | Yes | $500 | |
Plumbing | Install private swimming pool or hot tub (electrical work as separate permit) | Yes | Yes | $400 |
Repair or in-kind replacement of hot water heater (individual equipment) or plumbing fixtures without alteration to plumbing in walls | No | No | $75 per dwelling unit, toilet room, or tenant space | |
Repair or in-kind replacement of hot water heater serving more than one dwelling unit or tenant space without alteration to plumbing in walls | No | No | $150 each | |
Repair or in-kind replacement of plumbing piping, with or without plumbing fixture replacement, all occupancies | No a, d | No | $150 per dwelling unit, toilet room, or tenant space | |
Repair or in-kind replacement of plumbing riser within existing plumbing chase | No a, d | No | $150 per dwelling unit, toilet room, or tenant space served | |
Porch, deck, balcony, or similar structure | Limited repair (replacement of up to 25% of existing material) | Yes a | No | $75 |
Repair (replacement of 26% to 50% of existing material) | Yes | No | $150 per structure | |
Reconstruction, same size and location | Yes | No | $300 per structure | |
Repairs | Repair or in-kind replacement for minor scope of work, such as window or door replacement, not involving HVAC, electrical, or plumbing work | No | No | $175 per dwelling unit or tenant space |
Roof | Installation, alteration, or repair for a rooftop structure | Yes a | Yes | $175 |
Roof recover (no tear off) | No | No | $175 per area up to 5,000 square feet | |
Roof repair | No | No | $175 | |
Roof replacement | No | No | $450 per area up to 5,000 square feet | |
Signs c | Sign less than 50 square feet in area | Yes | Yes | $50 per face |
Sign from 50 square feet to less than 100 square feet in area | Yes | Yes | $100 per face | |
Sign from 100 square feet to less than 200 in area | Yes | Yes | $200 per face | |
Sign from 200 square feet to less than 500 square feet in area | Yes | Yes | $500 per face | |
Sign 500 square feet or greater in area | Yes | Yes | $1,000 per face | |
Temporary structures | Construction trailers (single story) | No | No | $250 per year |
Scaffolding | No | No | $150 each | |
Temporary structures, such as canopies, platforms, tents, trailers, seating stands, shipping containers, and stages, not exceeding 2,500 square feet in total floor area per event i | Yes a | Yes | $250 | |
Temporary seating stands covering more than 2,500 square feet of ground area | Yes | Yes | $450 | |
For SI: 1 foot = 304.8 mm; 1 square foot = 0.0929 m
2.
a. Requirement for drawings or that drawings be prepared by a registered design professional may be waived by the building official based on specific scope of work.
b. Fees for sprinkler system and/or standpipe reviews in Section 15-16-190 of the Municipal Code will be assessed in addition to the fees in Table 14A-12-1204.2.
c. The fee for this scope of work will be assessed in addition to the permit fee calculated in accordance with Section 14A-12-1204.3.
d. Where drawings are required, the fee will be assessed in accordance with Section 14A-12-1204.3.
e. A zoning fee may be required based on the specific equipment and installation location.
f. Telephone, security, cable, and media are each separate systems.
g. This fee is in addition to any other fines, penalties, or other fees associated with the administrative request. See Sections 14A-4-413.9 and 14A-4-413.10 regarding time limits, Section 14A-4-413.9 regarding permit reinstatement, and Section 14A-4-412.4 regarding permits issued to resolve stop work orders.
h. This fee is in addition to any permit fees for associated plumbing or electrical work.
i. Where the total floor area of temporary structures, other than seating stands, exceeds 2,500 square feet per event, the permit fee must be calculated in accordance with Table 14A-12-1204.3(1) for Group U occupancies of Type V construction.
(Amend Coun. J. 7-24-19, p. 3646, § 24; Amend Coun. J. 10-7-20, p. 21791, Art. I, § 22; Amend Coun. J. 6-25-21, p. 32180, Art. I, § 14; Amend Coun. J. 9-21-22, p. 52080, Art. II, § 4; Amend Coun. J. 12-14-22, p. 58278, Art. II, § 15; Amend Coun. J. 1-24-24, p. 8634, Art. III, § 5)
Permit fee factors applicable to Section 14A-4-412.2 are as provided in Tables 14A-12-1204.3(1) through 14A-12-1204.3(6) as modified by Section 14A-12-1204.3.1.
(Amend Coun. J. 10-27-21, p. 40504, Art. IV, § 3)
I
|
II
|
III
|
IV
|
V
| |
Group A-1 (with stage) | $0.87 | $0.81 | $0.79 | $0.75 | $0.69 |
Group A-1 (without stage) | $0.80 | $0.74 | $0.71 | $0.68 | $0.54 |
Group A-2 Group A-3 Group A-4 | $0.71 | $0.66 | $0.62 | $0.60 | $0.54 |
Group A-5 | $0.79 | $0.73 | $0.71 | $0.67 | $0.61 |
Group B | $0.69 | $0.64 | $0.61 | $0.57 | $0.50 |
Group E | $0.72 | $0.66 | $0.65 | $0.60 | $0.53 |
Group F | $0.47 | $0.37 | $0.35 | $0.32 | $0.26 |
Group H | $0.69 | $0.64 | $0.61 | $0.57 | $0.50 |
Group I | $0.87 | $0.81 | $0.80 | $0.71 | $0.64 |
Group M | $0.50 | $0.46 | $0.43 | $0.41 | $0.35 |
Group R-1 Group R-2 Group R-3 | $0.69 | $0.64 | $0.64 | $0.58 | $0.52 |
Group R-4 Group R-5 | $0.43 | $0.41 | $0.40 | $0.39 | $0.36 |
Group S | $0.44 | $0.34 | $0.32 | $0.29 | $0.23 |
Group U | $0.29 | $0.25 | $0.24 | $0.22 | $0.19 |
a. Buildings containing more than one occupancy will be assessed fees based on the gross floor area occupied by each occupancy. Common areas in mixed-occupancy buildings will be assessed fees based on the classification of the predominant occupancy. If a single occupancy occupies 85 percent or more of the building area, the entire fee will be based on that occupancy classification.
b. A building may only be classified as a single construction type.
(Amend Coun. J. 10-27-21, p. 40504, Art. IV, § 5)
Editor's note – Coun. J. 10-27-21, p. 40504, Art. IV, § 6, repealed Table 14A-12-1204.3(2), which pertained to construction factor for rehabilitation.
Occupancy Classification per Chapter 14B-3
| Factor b |
Description of Work
| Minimum Fee c |
Occupancy Classification per Chapter 14B-3
| Factor b |
Description of Work
| Minimum Fee c |
Group A | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | All new construction, including first buildout of tenant space | $3,000 | |
Group B | 0.25 | Not applicable | |
0.5 | Free-standing kiosk used for business | $750 | |
Initial buildout of a tenant space, including sales centers and model units, excluding telecommunication equipment areas and ambulatory care facilities | $750 per story | ||
0.75 | Construction of a single-story building, excluding telecommunications equipment areas and ambulatory care facilities | $3,000 | |
1.0 | Construction or initial buildout including a telecommunication equipment area |
$2,000 | |
Construction or initial buildout of an ambulatory care facility | $3,000 | ||
Construction of a multi-story building | $3,000 | ||
Group E | 0.25 | Not applicable | |
0.5 | Initial buildout of a tenant space | $750 per story | |
0.75 | Not applicable | ||
1.0 | All other new construction | $3,000 | |
Group F | 0.25 | Not applicable | |
0.5 | |||
0.75 | Single-story building without regulated equipment |
$2,000 | |
1.0 | Multi-story building without regulated equipment |
$3,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
Group H | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | Facility without regulated equipment |
$3,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
Group I | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | Facility without regulated equipment |
$2,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
Group M | 0.25 | Not applicable | |
0.5 | Free-standing kiosk used for retail | $750 | |
Initial buildout of a tenant space, including sales centers and model units | $750 per story | ||
0.75 | Construction of a single-story building | $3,000 | |
1.0 | Construction of a multi-story building | $3,000 | |
Group R | 0.25 | Not applicable | |
0.5 | Detached private garage or carport (fee in addition to primary residence fee) | $500 | |
0.75 | Residential construction with maximum of 4 stories and maximum of 3 dwelling units | $2,000 | |
1.0 | Residential construction with 5 or more stories or 4 or more dwelling units | $3,000 | |
Residential construction with any number of sleeping units | $3,000 | ||
Group S | 0.25 | Not applicable | |
0.5 | |||
0.75 | Single-story facility without regulated equipment |
$2,000 | |
1.0 | Multi-story facility without regulated equipment |
$3,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
Group U | 0.25 | Not applicable | |
0.5 | Detached private garage or carport (fee in addition to fee for main building) | $500 | |
Temporary structures not covered in Table 14A-12-1204.2 | $250 | ||
0.75 | Single-story building or structure not more than 15 feet above the ground, such as a parking lot, bridge, bus shelter, or retaining wall, not covered in Table 14A-12-1204.2 | $250 | |
1.0 | Multi-story building or structure more than 15 feet above the ground, such as a utility plant, cell phone tower, or rail station | $3,000 | |
Mixed Occupancy | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | Facility without regulated equipment |
$3,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
For SI: 1 foot = 304.8 mm.
a. Stop work order penalties provided for in Section 14A-4-412.4 are in addition to these permit fees.
b. Where more than one scope of review factor applies because of the diverse scope of work, the highest applicable multiplier applies to all areas.
c. A minimum fee of $302 applies to all permits.
(Amend Coun. J. 7-24-19, p. 3646, § 24; Amend Coun. J. 10-27-21, p. 40504, Art. IV, § 7; Amend Coun. J. 1-24-24, p. 8634, Art. III, § 6)
Occupancy Classification per Chapter 14B-3
| Factor b |
Description of Work
| Minimum Fee c |
Occupancy Classification per Chapter 14B-3
| Factor b |
Description of Work
| Minimum Fee c |
All | 0.0 d | Ordinary demolition (Section 14A-4-407) | $500 |
Complex demolition (Section 14A-4-407) | $2,000 | ||
For interior demolition use Table 14A-12-1204.3(6) | |||
0.25 | Repair (nonstructural) | $500 | |
In-kind replacement of a single MEP system | $500 | ||
Alteration without the reconfiguration of space, the addition or elimination of any door or window, the reconfiguration or extension of any system, or the installation of additional equipment (Level 1 alteration) | $500 | ||
Roof repair, roof recover, or roof replacement with structural repair |
$750 | ||
For any scope under this multiplier: no structural work except as noted, no installation or alteration of regulated equipment | |||
0.5 | Structural repair as entire scope of work (except in residential buildings with 1 - 3 dwelling units and no mixed occupancy) | $750 | |
0.75 | Relocated building | $1,500 | |
Change of occupancy without an increase in any hazard category (per Chapter 10 of the Chicago Building Rehabilitation Code) and without creation of food-related facilities requiring a public health inspection | $2,000 | ||
1.0 | Change of occupancy or change of use involving creation of food-related facilities requiring a public o health inspection | $1,500 | |
Change of occupancy with an increase in any hazard category (per Chapter 10 of the Chicago Building Rehabilitation Code) | $3,000 | ||
Group A | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations | |||
0.75 | Level 2 or Level 3 alteration, occupant load less than 300 | $1,500 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations | |||
1.0 | Addition |
$2,000 | |
Creation or reconfiguration of mixed-occupancy or tenant separations | $3,000 | ||
Level 2 or Level 3 alteration, occupant load 300 or more | $3,000 | ||
Group B | 0.25 | Not applicable | |
0.5 | Level 2 or Level 3 alteration to a single tenant space on a single story, including existing telecommunication equipment area | $750 | |
Level 2 or Level 3 alteration to common areas on a single story | $750 | ||
Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $750 | ||
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations, no food-related facilities requiring public health inspection | |||
0.75 | Level 2 or Level 3 alteration to common areas on multiple stories | $1,500 | |
Level 2 or Level 3 alteration to multiple tenant spaces or multiple stories |
$1,500 | ||
Level 2 or Level 3 alteration to restaurant or other food-related facility requiring public health inspection | $1,500 | ||
For any scope under this multiplier: no changes to mixed occupancy or tenant separations | |||
1.0 | Addition |
$2,000 | |
Installation of new telecommunication equipment area where none previously existed | $2,000 | ||
Creation or reconfiguration of mixed-occupancy or tenant separations | $3,000 | ||
Group E | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations | |||
0.75 | Level 2 or Level 3 alteration |
$1,500 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations | |||
1.0 | Addition |
$2,000 | |
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
Group F | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
0.75 | Level 2 or Level 3 alteration to single-story building | $750 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
1.0 | Level 2 or Level 3 alteration to multi-story building | $1,500 | |
Addition |
$2,000 | ||
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
For any scope under this multiplier: no installation or alteration of regulated equipment | |||
1.25 | Any work including installation or alteration of regulated equipment | $1,500 | |
Group H | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
0.75 | Level 2 or Level 3 alteration to single-story building | $2,000 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
1.0 | Addition |
$3,000 | |
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
Level 2 or Level 3 alteration to multi-story building | $3,000 | ||
For any scope under this multiplier: no installation or alteration of regulated equipment | |||
1.25 | Any work including installation or alteration of regulated equipment | $1,500 | |
Group I | 0.25 | Not applicable | |
0.5 | |||
0.75 | Level 2 or Level 3 alteration to single-story building | $1,500 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no alteration or creation of machine room, no installation or alteration of regulated equipment | |||
1.0 | Creation or alteration of machine room | $2,000 | |
Addition |
$3,000 | ||
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
Level 2 or Level 3 alteration to multi-story building | $3,000 | ||
For any scope under this multiplier: no installation or alteration of regulated equipment | |||
1.25 | Any work including installation or alteration of regulated equipment |
$1,500 | |
Group M | 0.25 | Not applicable | |
0.5 | Level 2 or Level 3 alteration to a single tenant space on a single story, including existing telecommunication equipment area | $750 | |
Level 2 or Level 3 alteration to common areas on a single story | $750 | ||
Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $750 | ||
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations | |||
0.75 | Level 2 or Level 3 alteration involving structural work | $1,500 | |
Level 2 or Level 3 alteration to common areas on multiple stories | $1,500 | ||
Level 2 or Level 3 alteration to multiple tenant spaces or multiple stories | $1,500 | ||
For any scope under this multiplier: no changes to mixed occupancy or tenant separations | |||
1.0 | Addition |
$2,000 | |
Installation of new telecommunication equipment area where none previously existed | $2,000 | ||
Creation or reconfiguration of mixed occupancy or tenant separations | $2,000 | ||
Group R | 0.25 | Repair or in-kind replacement of existing porch, balcony, deck, exterior stair, or occupiable rooftop (no reconfiguration) | $200 each |
Structural repair as entire scope of work, building with 1 - 3 dwelling units and no mixed occupancy | $500 | ||
0.5 | Installation or alteration of porch, balcony, deck, exterior stair, or occupiable rooftop | $200 per unit served | |
Level 2 or Level 3 alteration, building with 1 - 3 dwelling units and no mixed occupancy | $500 | ||
Level 2 or Level 3 alteration to single dwelling unit | $500 | ||
Repair or in-kind replacement of more than one shared MEP system (no reconfiguration) | $1,500 | ||
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no change in number of dwelling units or sleeping units | |||
0.75 | Level 2 or Level 3 alteration to 4 - 29 dwelling units or sleeping units and common areas in same building |
$250 per unit | |
Addition to building with 1 - 3 dwelling units and no mixed occupancy | $750 | ||
Level 2 alteration to common areas only in a building with 4 or more dwelling units or any number of sleeping units | $1,500 | ||
For any scope under this multiplier: no non-residential occupancy in scope, no changes to mixed occupancy or tenant separations, no change in number of dwelling units or sleeping units | |||
1.0 | Level 2 or Level 3 alteration to 30 or more dwelling units or sleeping units and common areas in same building |
$250 per unit | |
Decrease in number of dwelling units or sleeping units | $750 | ||
Increase in number of dwelling units or sleeping units | $1,500 | ||
Addition to building with 4 or more dwelling units or any number of sleeping units | $2,000 | ||
Alteration to mixed occupancy or tenant separation | $2,000 | ||
Group S | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
0.75 | Level 2 or Level 3 alteration to single-story building | $750 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
1.0 | Level 2 or Level 3 alteration to multi-story building | $1,500 | |
Addition | $2,000 | ||
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
For any scope under this multiplier: no installation or alteration of regulated equipment | |||
1.25 | Any work including installation or alteration of regulated equipment | $1,500 | |
Group U | 0.25 | Not applicable | |
0.5 | |||
0.75 | Level 2 or 3 alteration to a single-story building or structure not more than 15 feet above the ground, such as a parking lot, bridge, bus shelter, or retaining wall not covered in Table 14A-12-1204.2 | $250 | |
1.0 | Level 2 or 3 alteration to a multi-story building or structure more than 15 feet above the ground, such as a utility plant, cell phone towers, or rail station | $500 | |
Addition to building |
$500 | ||
Mixed Occupancy | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | Facility without regulated equipment, no changes to mixed occupancy or tenant separations | $1,500 | |
Facility without regulated equipment, creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
1.25 | Facility with regulated equipment |
$3,000 | |
For SI: 1 foot = 304.8 mm.
a. Stop work order penalties provided for in Section 14A-4-412.4 are in addition to these permit fees.
b. Where more than one scope of review factor applies because of the diverse scope of work, the highest applicable multiplier applies to all areas.
c. A minimum fee of $302 applies to all permits.
(Amend Coun. J. 7-24-19, p. 3646, § 24; Amend Coun. J. 10-7-20, p. 21791, Art. I, § 23; Amend Coun. J. 6-25-21, p. 32180, Art. I, § 15; Amend Coun. J. 10-27-21, p. 40504, Art. IV, § 8; Amend Coun. J. 1-26-22, p. 43756, Art. I, § 7)
Factor b |
Description of Work
| Minimum Fee c |
Factor b |
Description of Work
| Minimum Fee c |
0.05 | Tuckpointing and repair to unit masonry | $300 |
Siding repair or in-kind replacement | $300 | |
0.10 | Window wall and curtain wall repair or in-kind replacement | $500 |
0.5 | Lintel repair (based on contributing area supported by lintel) | $250 |
Concrete repair | $500 | |
1.0 | Parapet rebuilding | $250 |
Fascia repair or in-kind replacement | $250 | |
Repair to decorative projecting elements, such as cornices | $250 | |
a. Stop work order penalties provided for in Section 14A-4-412.4 are in addition to these permit fees.
b. Where more than one scope of review factor applies to the proposed work, the permit application must indicate the area of each type of work, and the applicable factor will be applied to each area.
c. A minimum fee of $302 applies to all permits.
(Amend Coun. J. 7-24-19, p. 3646, § 24)
Factor b |
Description of Work
| Minimum Fee c |
Factor b |
Description of Work
| Minimum Fee c |
0.25 | Caissons only, or slurry wall only, or grade beams only (no area) | $6,000 |
Interior demolition work, including the removal of mechanical, electrical, and plumbing systems, with no structural work and no alteration of fire separations, in preparation for rehabilitation work | $300 | |
0.5 | All other below-grade construction (foundation, below grade floors) | $3,000 |
0.75 | Above-grade new construction or addition work where same building area will be permitted in more than one phase of construction | $3,000 |
Interior demolition work, with structural work or alteration of fire separations, in preparation for rehabilitation work | $1,000 | |
Rehabilitation work with interior demolition work for same building area permitted as a separate phase | ||
1.0 | Above-grade new construction or addition with only below-grade work as a separate phase | $3,000 |
a. Stop work order penalties provided for in Section 14A-4-412.4 are in addition to these permit fees.
b. Where more than one scope of review factor applies because of the diverse scope of work, the highest applicable multiplier applies to all areas.
c. A minimum fee of $302 applies to all permits.
(Amend Coun. J. 7-24-19, p. 3646, § 24; Amend Coun. J. 10-7-20, p. 21791, Art. I, § 24)
Beginning in 2022, on or before October 1 of each year, the building official must determine the percentage change in the Consumer Price Index for All Urban Consumers, US City Average (CPI-U) from January 2021 to January of the present year and prepare fee schedules, based on Tables 14A-12-1204.3(1) through 14A-12-1204.3(6), with monetary values in the bodies of the table adjusted in proportion to the change in CPI-U. The building official may round minimum fees to the nearest $50 increment. Fee schedules prepared by the building official in accordance with this section and published on the City's public web site are effective on January 1 of the succeeding year.
(Added Coun. J. 10-27-21, p. 40504, Art. IV, § 4)
Where a penalty must be added to the permit fee in accordance with Section 14A-4-412.4 it must be assessed in accordance with Table 14A-12-1204.4.
Where the stop work order was issued because work was done by a person lacking a trade license required under the Municipal Code or by a person required by the Municipal Code to be listed on the permit application who was not listed, the penalty is the amount provided in Table 14A-12-1204.4 based on the amount of the regular permit fee plus $1,000.
Regular Permit Fee
|
Reason | Penalty Amount
|
Any amount | Work without a required permit or beyond scope of issued permit, or performed by a person who is required to be licensed or listed on the permit application and is not | 200% of regular permit fee |
Work pursuant to a permit but that is unsafe or contrary to the Chicago Construction Codes or Chicago Zoning Ordinance | 100% of regular permit fee |
(Amend Coun. J. 12-14-22, p. 58278, Art. II, § 16)
Fees applicable to the provisions of Chapter 5 are as provided in Table 14A-12-1205.1.
Section
|
Description
|
Amount
|
Reinspection fee (per inspection) | $100 | |
Extra inspection fee (per inspector, per hour or fractional hour) Minimum fee | $100 $250 |