Permit fee factors applicable to Section 14A-4-412.2 are as provided in Tables 14A-12-1204.3(1) through 14A-12-1204.3(6) as modified by Section 14A-12-1204.3.1.
(Amend Coun. J. 10-27-21, p. 40504, Art. IV, § 3)
I
|
II
|
III
|
IV
|
V
| |
Group A-1 (with stage) | $0.87 | $0.81 | $0.79 | $0.75 | $0.69 |
Group A-1 (without stage) | $0.80 | $0.74 | $0.71 | $0.68 | $0.54 |
Group A-2 Group A-3 Group A-4 | $0.71 | $0.66 | $0.62 | $0.60 | $0.54 |
Group A-5 | $0.79 | $0.73 | $0.71 | $0.67 | $0.61 |
Group B | $0.69 | $0.64 | $0.61 | $0.57 | $0.50 |
Group E | $0.72 | $0.66 | $0.65 | $0.60 | $0.53 |
Group F | $0.47 | $0.37 | $0.35 | $0.32 | $0.26 |
Group H | $0.69 | $0.64 | $0.61 | $0.57 | $0.50 |
Group I | $0.87 | $0.81 | $0.80 | $0.71 | $0.64 |
Group M | $0.50 | $0.46 | $0.43 | $0.41 | $0.35 |
Group R-1 Group R-2 Group R-3 | $0.69 | $0.64 | $0.64 | $0.58 | $0.52 |
Group R-4 Group R-5 | $0.43 | $0.41 | $0.40 | $0.39 | $0.36 |
Group S | $0.44 | $0.34 | $0.32 | $0.29 | $0.23 |
Group U | $0.29 | $0.25 | $0.24 | $0.22 | $0.19 |
a. Buildings containing more than one occupancy will be assessed fees based on the gross floor area occupied by each occupancy. Common areas in mixed-occupancy buildings will be assessed fees based on the classification of the predominant occupancy. If a single occupancy occupies 85 percent or more of the building area, the entire fee will be based on that occupancy classification.
b. A building may only be classified as a single construction type.
(Amend Coun. J. 10-27-21, p. 40504, Art. IV, § 5)
Editor's note – Coun. J. 10-27-21, p. 40504, Art. IV, § 6, repealed Table 14A-12-1204.3(2), which pertained to construction factor for rehabilitation.
Occupancy Classification per Chapter 14B-3
| Factor b |
Description of Work
| Minimum Fee c |
Occupancy Classification per Chapter 14B-3
| Factor b |
Description of Work
| Minimum Fee c |
Group A | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | All new construction, including first buildout of tenant space | $3,000 | |
Group B | 0.25 | Not applicable | |
0.5 | Free-standing kiosk used for business | $750 | |
Initial buildout of a tenant space, including sales centers and model units, excluding telecommunication equipment areas and ambulatory care facilities | $750 per story | ||
0.75 | Construction of a single-story building, excluding telecommunications equipment areas and ambulatory care facilities | $3,000 | |
1.0 | Construction or initial buildout including a telecommunication equipment area |
$2,000 | |
Construction or initial buildout of an ambulatory care facility | $3,000 | ||
Construction of a multi-story building | $3,000 | ||
Group E | 0.25 | Not applicable | |
0.5 | Initial buildout of a tenant space | $750 per story | |
0.75 | Not applicable | ||
1.0 | All other new construction | $3,000 | |
Group F | 0.25 | Not applicable | |
0.5 | |||
0.75 | Single-story building without regulated equipment |
$2,000 | |
1.0 | Multi-story building without regulated equipment |
$3,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
Group H | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | Facility without regulated equipment |
$3,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
Group I | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | Facility without regulated equipment |
$2,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
Group M | 0.25 | Not applicable | |
0.5 | Free-standing kiosk used for retail | $750 | |
Initial buildout of a tenant space, including sales centers and model units | $750 per story | ||
0.75 | Construction of a single-story building | $3,000 | |
1.0 | Construction of a multi-story building | $3,000 | |
Group R | 0.25 | Not applicable | |
0.5 | Detached private garage or carport (fee in addition to primary residence fee) | $500 | |
0.75 | Residential construction with maximum of 4 stories and maximum of 3 dwelling units | $2,000 | |
1.0 | Residential construction with 5 or more stories or 4 or more dwelling units | $3,000 | |
Residential construction with any number of sleeping units | $3,000 | ||
Group S | 0.25 | Not applicable | |
0.5 | |||
0.75 | Single-story facility without regulated equipment |
$2,000 | |
1.0 | Multi-story facility without regulated equipment |
$3,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
Group U | 0.25 | Not applicable | |
0.5 | Detached private garage or carport (fee in addition to fee for main building) | $500 | |
Temporary structures not covered in Table 14A-12-1204.2 | $250 | ||
0.75 | Single-story building or structure not more than 15 feet above the ground, such as a parking lot, bridge, bus shelter, or retaining wall, not covered in Table 14A-12-1204.2 | $250 | |
1.0 | Multi-story building or structure more than 15 feet above the ground, such as a utility plant, cell phone tower, or rail station | $3,000 | |
Mixed Occupancy | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | Facility without regulated equipment |
$3,000 | |
1.25 | Facility with regulated equipment |
$3,000 | |
For SI: 1 foot = 304.8 mm.
a. Stop work order penalties provided for in Section 14A-4-412.4 are in addition to these permit fees.
b. Where more than one scope of review factor applies because of the diverse scope of work, the highest applicable multiplier applies to all areas.
c. A minimum fee of $302 applies to all permits.
(Amend Coun. J. 7-24-19, p. 3646, § 24; Amend Coun. J. 10-27-21, p. 40504, Art. IV, § 7; Amend Coun. J. 1-24-24, p. 8634, Art. III, § 6)
Occupancy Classification per Chapter 14B-3
| Factor b |
Description of Work
| Minimum Fee c |
Occupancy Classification per Chapter 14B-3
| Factor b |
Description of Work
| Minimum Fee c |
All | 0.0 d | Ordinary demolition (Section 14A-4-407) | $500 |
Complex demolition (Section 14A-4-407) | $2,000 | ||
For interior demolition use Table 14A-12-1204.3(6) | |||
0.25 | Repair (nonstructural) | $500 | |
In-kind replacement of a single MEP system | $500 | ||
Alteration without the reconfiguration of space, the addition or elimination of any door or window, the reconfiguration or extension of any system, or the installation of additional equipment (Level 1 alteration) | $500 | ||
Roof repair, roof recover, or roof replacement with structural repair |
$750 | ||
For any scope under this multiplier: no structural work except as noted, no installation or alteration of regulated equipment | |||
0.5 | Structural repair as entire scope of work (except in residential buildings with 1 - 3 dwelling units and no mixed occupancy) | $750 | |
0.75 | Relocated building | $1,500 | |
Change of occupancy without an increase in any hazard category (per Chapter 10 of the Chicago Building Rehabilitation Code) and without creation of food-related facilities requiring a public health inspection | $2,000 | ||
1.0 | Change of occupancy or change of use involving creation of food-related facilities requiring a public o health inspection | $1,500 | |
Change of occupancy with an increase in any hazard category (per Chapter 10 of the Chicago Building Rehabilitation Code) | $3,000 | ||
Group A | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations | |||
0.75 | Level 2 or Level 3 alteration, occupant load less than 300 | $1,500 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations | |||
1.0 | Addition |
$2,000 | |
Creation or reconfiguration of mixed-occupancy or tenant separations | $3,000 | ||
Level 2 or Level 3 alteration, occupant load 300 or more | $3,000 | ||
Group B | 0.25 | Not applicable | |
0.5 | Level 2 or Level 3 alteration to a single tenant space on a single story, including existing telecommunication equipment area | $750 | |
Level 2 or Level 3 alteration to common areas on a single story | $750 | ||
Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $750 | ||
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations, no food-related facilities requiring public health inspection | |||
0.75 | Level 2 or Level 3 alteration to common areas on multiple stories | $1,500 | |
Level 2 or Level 3 alteration to multiple tenant spaces or multiple stories |
$1,500 | ||
Level 2 or Level 3 alteration to restaurant or other food-related facility requiring public health inspection | $1,500 | ||
For any scope under this multiplier: no changes to mixed occupancy or tenant separations | |||
1.0 | Addition |
$2,000 | |
Installation of new telecommunication equipment area where none previously existed | $2,000 | ||
Creation or reconfiguration of mixed-occupancy or tenant separations | $3,000 | ||
Group E | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations | |||
0.75 | Level 2 or Level 3 alteration |
$1,500 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations | |||
1.0 | Addition |
$2,000 | |
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
Group F | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
0.75 | Level 2 or Level 3 alteration to single-story building | $750 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
1.0 | Level 2 or Level 3 alteration to multi-story building | $1,500 | |
Addition |
$2,000 | ||
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
For any scope under this multiplier: no installation or alteration of regulated equipment | |||
1.25 | Any work including installation or alteration of regulated equipment | $1,500 | |
Group H | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
0.75 | Level 2 or Level 3 alteration to single-story building | $2,000 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
1.0 | Addition |
$3,000 | |
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
Level 2 or Level 3 alteration to multi-story building | $3,000 | ||
For any scope under this multiplier: no installation or alteration of regulated equipment | |||
1.25 | Any work including installation or alteration of regulated equipment | $1,500 | |
Group I | 0.25 | Not applicable | |
0.5 | |||
0.75 | Level 2 or Level 3 alteration to single-story building | $1,500 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no alteration or creation of machine room, no installation or alteration of regulated equipment | |||
1.0 | Creation or alteration of machine room | $2,000 | |
Addition |
$3,000 | ||
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
Level 2 or Level 3 alteration to multi-story building | $3,000 | ||
For any scope under this multiplier: no installation or alteration of regulated equipment | |||
1.25 | Any work including installation or alteration of regulated equipment |
$1,500 | |
Group M | 0.25 | Not applicable | |
0.5 | Level 2 or Level 3 alteration to a single tenant space on a single story, including existing telecommunication equipment area | $750 | |
Level 2 or Level 3 alteration to common areas on a single story | $750 | ||
Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $750 | ||
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations | |||
0.75 | Level 2 or Level 3 alteration involving structural work | $1,500 | |
Level 2 or Level 3 alteration to common areas on multiple stories | $1,500 | ||
Level 2 or Level 3 alteration to multiple tenant spaces or multiple stories | $1,500 | ||
For any scope under this multiplier: no changes to mixed occupancy or tenant separations | |||
1.0 | Addition |
$2,000 | |
Installation of new telecommunication equipment area where none previously existed | $2,000 | ||
Creation or reconfiguration of mixed occupancy or tenant separations | $2,000 | ||
Group R | 0.25 | Repair or in-kind replacement of existing porch, balcony, deck, exterior stair, or occupiable rooftop (no reconfiguration) | $200 each |
Structural repair as entire scope of work, building with 1 - 3 dwelling units and no mixed occupancy | $500 | ||
0.5 | Installation or alteration of porch, balcony, deck, exterior stair, or occupiable rooftop | $200 per unit served | |
Level 2 or Level 3 alteration, building with 1 - 3 dwelling units and no mixed occupancy | $500 | ||
Level 2 or Level 3 alteration to single dwelling unit | $500 | ||
Repair or in-kind replacement of more than one shared MEP system (no reconfiguration) | $1,500 | ||
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no change in number of dwelling units or sleeping units | |||
0.75 | Level 2 or Level 3 alteration to 4 - 29 dwelling units or sleeping units and common areas in same building |
$250 per unit | |
Addition to building with 1 - 3 dwelling units and no mixed occupancy | $750 | ||
Level 2 alteration to common areas only in a building with 4 or more dwelling units or any number of sleeping units | $1,500 | ||
For any scope under this multiplier: no non-residential occupancy in scope, no changes to mixed occupancy or tenant separations, no change in number of dwelling units or sleeping units | |||
1.0 | Level 2 or Level 3 alteration to 30 or more dwelling units or sleeping units and common areas in same building |
$250 per unit | |
Decrease in number of dwelling units or sleeping units | $750 | ||
Increase in number of dwelling units or sleeping units | $1,500 | ||
Addition to building with 4 or more dwelling units or any number of sleeping units | $2,000 | ||
Alteration to mixed occupancy or tenant separation | $2,000 | ||
Group S | 0.25 | Not applicable | |
0.5 | Repair or in-kind replacement of more than one MEP system (no reconfiguration) | $1,500 | |
For any scope under this multiplier: no structural work, no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
0.75 | Level 2 or Level 3 alteration to single-story building | $750 | |
For any scope under this multiplier: no changes to mixed occupancy or tenant separations, no installation or alteration of regulated equipment | |||
1.0 | Level 2 or Level 3 alteration to multi-story building | $1,500 | |
Addition | $2,000 | ||
Creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
For any scope under this multiplier: no installation or alteration of regulated equipment | |||
1.25 | Any work including installation or alteration of regulated equipment | $1,500 | |
Group U | 0.25 | Not applicable | |
0.5 | |||
0.75 | Level 2 or 3 alteration to a single-story building or structure not more than 15 feet above the ground, such as a parking lot, bridge, bus shelter, or retaining wall not covered in Table 14A-12-1204.2 | $250 | |
1.0 | Level 2 or 3 alteration to a multi-story building or structure more than 15 feet above the ground, such as a utility plant, cell phone towers, or rail station | $500 | |
Addition to building |
$500 | ||
Mixed Occupancy | 0.25 | Not applicable | |
0.5 | |||
0.75 | |||
1.0 | Facility without regulated equipment, no changes to mixed occupancy or tenant separations | $1,500 | |
Facility without regulated equipment, creation or reconfiguration of mixed occupancy or tenant separations | $3,000 | ||
1.25 | Facility with regulated equipment |
$3,000 | |
For SI: 1 foot = 304.8 mm.
a. Stop work order penalties provided for in Section 14A-4-412.4 are in addition to these permit fees.
b. Where more than one scope of review factor applies because of the diverse scope of work, the highest applicable multiplier applies to all areas.
c. A minimum fee of $302 applies to all permits.
(Amend Coun. J. 7-24-19, p. 3646, § 24; Amend Coun. J. 10-7-20, p. 21791, Art. I, § 23; Amend Coun. J. 6-25-21, p. 32180, Art. I, § 15; Amend Coun. J. 10-27-21, p. 40504, Art. IV, § 8; Amend Coun. J. 1-26-22, p. 43756, Art. I, § 7)
Factor b |
Description of Work
| Minimum Fee c |
Factor b |
Description of Work
| Minimum Fee c |
0.05 | Tuckpointing and repair to unit masonry | $300 |
Siding repair or in-kind replacement | $300 | |
0.10 | Window wall and curtain wall repair or in-kind replacement | $500 |
0.5 | Lintel repair (based on contributing area supported by lintel) | $250 |
Concrete repair | $500 | |
1.0 | Parapet rebuilding | $250 |
Fascia repair or in-kind replacement | $250 | |
Repair to decorative projecting elements, such as cornices | $250 | |
a. Stop work order penalties provided for in Section 14A-4-412.4 are in addition to these permit fees.
b. Where more than one scope of review factor applies to the proposed work, the permit application must indicate the area of each type of work, and the applicable factor will be applied to each area.
c. A minimum fee of $302 applies to all permits.
(Amend Coun. J. 7-24-19, p. 3646, § 24)
Factor b |
Description of Work
| Minimum Fee c |
Factor b |
Description of Work
| Minimum Fee c |
0.25 | Caissons only, or slurry wall only, or grade beams only (no area) | $6,000 |
Interior demolition work, including the removal of mechanical, electrical, and plumbing systems, with no structural work and no alteration of fire separations, in preparation for rehabilitation work | $300 | |
0.5 | All other below-grade construction (foundation, below grade floors) | $3,000 |
0.75 | Above-grade new construction or addition work where same building area will be permitted in more than one phase of construction | $3,000 |
Interior demolition work, with structural work or alteration of fire separations, in preparation for rehabilitation work | $1,000 | |
Rehabilitation work with interior demolition work for same building area permitted as a separate phase | ||
1.0 | Above-grade new construction or addition with only below-grade work as a separate phase | $3,000 |
a. Stop work order penalties provided for in Section 14A-4-412.4 are in addition to these permit fees.
b. Where more than one scope of review factor applies because of the diverse scope of work, the highest applicable multiplier applies to all areas.
c. A minimum fee of $302 applies to all permits.
(Amend Coun. J. 7-24-19, p. 3646, § 24; Amend Coun. J. 10-7-20, p. 21791, Art. I, § 24)