Skip to code content (skip section selection)
Compare to:
Chicago Overview
Municipal Code of Chicago
MUNICIPAL CODE OF CHICAGO
TITLE 1 GENERAL PROVISIONS
TITLE 2 CITY GOVERNMENT AND ADMINISTRATION
TITLE 3 REVENUE AND FINANCE
TITLE 4 BUSINESSES, OCCUPATIONS AND CONSUMER PROTECTION
TITLE 5 HOUSING AND ECONOMIC DEVELOPMENT
TITLE 6 HUMAN RIGHTS*
TITLE 7 HEALTH AND SAFETY
TITLE 8 OFFENSES AFFECTING PUBLIC PEACE, MORALS AND WELFARE
TITLE 9 VEHICLES, TRAFFIC AND RAIL TRANSPORTATION
TITLE 10 STREETS, PUBLIC WAYS, PARKS, AIRPORTS AND HARBORS
TITLE 11 UTILITIES AND ENVIRONMENTAL PROTECTION
TITLE 12 RESERVED
TITLE 13 BUILDINGS AND CONSTRUCTION
TITLE 14 RESERVED*
TITLE 14A ADMINISTRATIVE PROVISIONS OF THE CHICAGO CONSTRUCTION CODES*
TITLE 14B BUILDING CODE*
TITLE 14C CONVEYANCE DEVICE CODE*
TITLE 14E ELECTRICAL CODE*
TITLE 14F FIRE PREVENTION CODE*
TITLE 14G FUEL GAS CODE*
TITLE 14M MECHANICAL CODE*
TITLE 14N 2022 ENERGY TRANSFORMATION CODE*
TITLE 14P PLUMBING CODE*
TITLE 14R BUILDING REHABILITATION CODE*
TITLE 14X MINIMUM REQUIREMENTS FOR EXISTING BUILDINGS*
TITLE 15 FIRE PREVENTION
TITLE 16 LAND USE
TITLE 17 CHICAGO ZONING ORDINANCE
TITLE 18 BUILDING INFRASTRUCTURE
APPENDIX TO THE MUNICIPAL CODE OF CHICAGO (RESERVED)*
TABLES
Chicago Zoning Ordinance and Land Use Ordinance
Loading...
14A-4-411.9 Retention of construction documents.
A copy of the permitted construction documents must be retained by the building official for a period of not less than 6 months from date of completion of the permitted work.
14A-4-412 FEES.
14A-4-412.1 Stand-alone permits.
The fee for any permit covering only scopes of work described in Table 14A-12-1204.2 must be paid as provided in Sections 14A-4-412.1.1 through 14A-4-412.1.2. If the total scope of work described in the permit application includes more than one scope of work listed in Table 14A-12-1204.2, the total fee will include each applicable fee. Where a permit application is submitted electronically and it must be reviewed before issuance of a permit, the building official is authorized to collect a review fee, as provided in Table 14A-12-1204.1, before the application is reviewed. Where applicable, the review fee is in addition to the base permit fee and in lieu of the deposit fee provided for in Section 14A-4-412.1.2.
(Amend Coun. J. 10-7-20, p. 21791, Art. I, § 13)
14A-4-412.1.1 Drawings not required.
If Table 14A-12-1204.2 indicates or the building official determines that drawings are not required for the scope of work covered by a permit application, the permit fee indicated in Table 14A-12-1204.2 must be paid to the City at the time of permit issuance.
14A-4-412.1.2 Drawings required.
If Table 14A-12-1204.2 indicates that drawings are required for any scope of work covered by a permit application, and the permit application is submitted electronically or the building official is unable to immediately review the drawings at the time when the permit application is submitted, a non-refundable deposit as provided in Section 14A-12-1204.1 must be paid to the City at the time of submission of the permit application. The balance of the permit fee indicated in Table 14A-12-1204.2, if any, must be paid to the City at the time of permit issuance.
(Amend Coun. J. 10-7-20, p. 21791, Art. I, § 14)