The fee for any permit covering only scopes of work described in Table 14A-12-1204.2 must be paid as provided in Sections 14A-4-412.1.1 through 14A-4-412.1.2. If the total scope of work described in the permit application includes more than one scope of work listed in Table 14A-12-1204.2, the total fee will include each applicable fee. Where a permit application is submitted electronically and it must be reviewed before issuance of a permit, the building official is authorized to collect a review fee, as provided in Table 14A-12-1204.1, before the application is reviewed. Where applicable, the review fee is in addition to the base permit fee and in lieu of the deposit fee provided for in Section 14A-4-412.1.2.
(Amend Coun. J. 10-7-20, p. 21791, Art. I, § 13)
If Table 14A-12-1204.2 indicates or the building official determines that drawings are not required for the scope of work covered by a permit application, the permit fee indicated in Table 14A-12-1204.2 must be paid to the City at the time of permit issuance.
If Table 14A-12-1204.2 indicates that drawings are required for any scope of work covered by a permit application, and the permit application is submitted electronically or the building official is unable to immediately review the drawings at the time when the permit application is submitted, a non-refundable deposit as provided in Section 14A-12-1204.1 must be paid to the City at the time of submission of the permit application. The balance of the permit fee indicated in Table 14A-12-1204.2, if any, must be paid to the City at the time of permit issuance.
(Amend Coun. J. 10-7-20, p. 21791, Art. I, § 14)
Loading...