The permit holder must notify the building official when plumbing work done pursuant to a permit is ready for the following types of inspections:
1. Underground inspection, after trenches or ditches are excavated and bedded, piping installed, and before any backfill is put in place.
2. Rough inspection, after the roof, framing, fireblocking, firestopping, draftstopping, and bracing is in place and all sanitary, storm, and water distribution piping is roughed-in, and before the installation of wall or ceiling membranes.
3. Final inspection, after all plumbing fixtures are in place and properly connected and the work area is ready for occupancy.
(Amend Coun. J. 2-19-20, p. 14473, Art. I, § 16)
The permit holder must notify the building official when mechanical refrigeration work done pursuant to a permit is ready for the following types of inspections:
1. Where portions of the mechanical refrigeration system will be concealed by construction: rough inspection, after the roof, framing, fireblocking, firestopping, draftstopping, and bracing is in place and all distribution piping is roughed-in, and before the installation of wall or ceiling membranes.
2. Final inspection, upon completion of the mechanical refrigeration system.
The permit holder must notify the building official when mechanical ventilation work done pursuant to a permit is ready for the following types of inspections:
1. Rough inspection, after the roof, framing, fireblocking, firestopping, draftstopping, and bracing is in place and all ducting and other components to be concealed are complete, and before the installation of wall or ceiling membranes.
2. Final inspection, upon completion of the ventilation system.
(Amend Coun. J. 2-19-20, p. 14473, Art. I, § 17)
Ordinary demolition work is not required to request progress inspections. For complex demolition work, requirements for progress inspections will be determined by the building official during the preliminary inspection in accordance with Section 14A-4-401.2. For complex demolition work, progress inspections must be requested by the permit holder as directed by the building official.
Where, prior to permit issuance, the building official determines progress inspections will be required for demolition work, an amount equal to the minimum fee for an extra inspection provided in Section 14A-5-501.5 must be added to the permit fee for each required progress inspection.
For each progress inspection in excess of the number of progress inspections incorporated in the permit fee pursuant to Section 14A-5-503.1.1, the owner must pay an extra inspection fee in accordance with Section 14A-5-501.5 prior to final inspection.