Sections 108.4, Work commencing before permit issuance, of the IEBC, is hereby established by adding the following sentence after said sections:
Sections 108.4 Work commencing before permit issuance Said fee shall be 100 percent of the usual permit fee in addition to the required permit fees.
Section 112, Means of Appeal, of the IEBC, is hereby amended by deleting said section and inserting in lieu thereof the following:
Section 112 Board of Examiners and Appeals Pursuant to the Ankeny Municipal Code, there is hereby created the Ankeny Board of Examiners and Appeals. Appeals shall be in accordance thereof.
Section 303.2, Addition to Group E Occupancy, of the IEBC, is hereby amended by deleting said section and inserting in lieu thereof the following:
Section 303.2 Addition to Group E Occupancy Where an addition is added to an existing Group E occupancy located in an area where the shelter design wind speed for tornadoes in 250 mph in accordance with Figure 304.2 (1) of ICC 500 and the program occupant load of the addition is 50 or more, the addition shall have a storm shelter constructed in accordance with Chapters 1 through 5 & 8 of ICC 500.
For the purposes of this section the installation of portable buildings for utilization on the campus or site for educational purposes shall be considered as an addition.
Exceptions:
1. Group E day care facilities.
2. Group E occupancies accessory to place of religious worship.
3. Additions meeting the requirements for shelter design in ICC 500.
4. Accessory structures and additions to existing group E sites where the occupancy classification of said structures are classified as Groups A-5 and U
The aggregate area of all additions within a 10 (ten) year period shall be factored when determining the requirements of this section.
Section 303.2.1, Required Occupant Capacity, of the IEBC, is hereby amended by deleting said section and inserting in lieu thereof the following:
Section 303.2.1 Required Occupant Capacity The required occupant capacity of the storm shelter shall include all buildings classified as a Group E occupancy on the campus or site, whichever is larger and shall be the greater of the following:
1. The total occupant load of the classrooms, vocational rooms and offices in the Group E occupancy.
2. The occupant load of any indoor assembly space that is associated with the Group E occupancy.
Exceptions:
1. Where an addition is being added on an existing Group E site, and where the addition is not of sufficient size to accommodate the required occupant capacity of the storm shelter for all of the buildings on-site, the storm shelter shall at a minimum accommodate the required capacity for the addition.
2. Where approved by the Code Official, the required occupant capacity of the shelter shall be permitted to be reduced by the occupant capacity of any existing storm shelters on the campus or site.
(Chapter 182 - Ord. 2080 – Dec. 21 Supp.)