Chapter 13.08
SEWER SERVICE SYSTEM
Sections:
Article 1. General Provisions
13.08.010   Purpose and policy.
13.08.020   Rules and regulations.
13.08.030   Short title.
Article 2. Definitions
13.08.040   Definitions.
Article 3. Use of Public Sewers Required
13.08.050   Disposal of wastes.
13.08.060   Treatment of wastes required.
13.08.070   Unlawful disposal.
13.08.080   Occupancy prohibited.
13.08.090   Private sewerage disposal systems--Continuation of use.
13.08.100   Private sewerage disposal systems--Restrictions and exceptions, continuation of use.
Article 4. Private Sewerage Disposal Construction
13.08.110   Prohibition of new systems or connections.
13.08.120   Sewer not available.
13.08.125   City's option to extend sewer.
13.08.130   Permit required.
13.08.140   Inspection required.
13.08.150   Design requirements.
13.08.160   Cost of maintenance by owner.
13.08.170   Additional requirements.
Article 5. Sewer Extensions, Financing and Costs Repayment
13.08.180   Private financing.
13.08.190   Public financing.
13.08.200   Existing sewer cost repayment.
13.08.205   Payment for sewer connections prior to July 1, 2010.
Article 6. Side Sewers and Connections
13.08.210   Permit required.
13.08.220   Installation and/or connection of lateral sewers by city.
13.08.230   Design considerations.
13.08.240   Separate sewers.
13.08.250   Sewer too low.
13.08.260   Connection to public sewer.
13.08.270   Safety precautions.
13.08.280   Completion of work.
13.08.290   Maintenance of side sewers.
Article 7. Public Sewer Construction
13.08.300   Permit required.
13.08.310   Plans, profiles and specifications required.
13.08.320   Subdivision.
13.08.330   Easements or rights-of-way.
13.08.340   Persons authorized to perform work.
13.08.350   Grade stakes.
13.08.360   Compliance with local regulations.
13.08.370   Protection of excavation.
13.08.380   Design and construction standards.
13.08.390   Bond--Public sewer construction.
13.08.400   All work to be inspected.
13.08.410   Notification.
13.08.420   Correct notices.
13.08.430   All costs paid by owner.
13.08.440   Contract with outside industrial and commercial users.
13.08.450   Street excavation permit.
13.08.460   Liability.
13.08.470   Time limit on permits.
Article 8. Regulation of Wastewater Discharges
13.08.480   Prohibitions on discharges.
13.08.490   Prohibitions on storm drainage and ground water.
13.08.500   Prohibition on unpolluted water.
13.08.510   Limitations on radioactive wastes.
13.08.520   Limitations on the use of garbage grinders.
13.08.530   Limitations on point of discharge.
13.08.540   Holding tank waste and septic tank waste.
13.08.550   Limitations on wastewater strength.
13.08.560   Limitations on infectious waste.
13.08.570   Traps required.
13.08.580   Construction of traps.
13.08.590   Maintenance of traps.
13.08.600   Pretreatment of wastes.
13.08.610   Maintenance of pretreatment facilities.
13.08.620   Monitoring facilities.
13.08.630   Inspection and sampling.
13.08.640   Notification of violation.
13.08.650   Notification of the discharge of hazardous waste.
13.08.655   Dental amalgam wastes.
13.08.660   Special agreements--Private facilities.
13.08.670   Special agreement--Public facilities.
13.08.680   Federal requirements limitations.
13.08.690   Regional water quality control board requirement limitations.
13.08.700   Other governmental agency jurisdictions.
Article 9. Permits and Fees
13.08.710   Permit required.
13.08.720   Application for permit.
13.08.730   Compliance with permit.
13.08.740   Agreement.
13.08.750   Basic connection charge.
13.08.755   Timing of fee payment.
13.08.760   Treatment connection charge.
13.08.770   Timing of fee payment.
13.08.780   Special connection charges.
13.08.790   Additional connection charges.
13.08.800   Classes of permits.
13.08.810   Permits and inspection charges.
13.08.815   Analytical requirements.
13.08.816   Sample collection.
13.08.820   Recordkeeping requirements.
Article 9A. Reporting Requirements
13.08.824   Baseline monitoring reports.
13.08.825   Compliance schedule progress reports.
13.08.826   Report on compliance with categorical pretreatment standard deadline.
13.08.827   Periodic compliance reports.
Article 10. Sewer Service Charges
13.08.830   Purpose and basis.
13.08.840   Setting of rates.
13.08.850   Discharge classification.
13.08.860   Flow measurement.
13.08.870   Collection.
13.08.880   Late charges.
13.08.890   Application.
Article 11. Administration and Enforcement
13.08.900   Violation unlawful.
13.08.910   Inspection and sampling.
13.08.920   Notice and correction.
13.08.925   Consent orders.
13.08.930   Compliance orders.
13.08.935   Public nuisance.
13.08.940   Disconnection.
13.08.950   Public nuisance--Abatement.
13.08.960   Means of enforcement only.
13.08.970   Accidental discharge/slug control plan.
13.08.980   Issuance of cease and desist orders.
13.08.990   Show cause hearing.
13.08.995   Submission of time schedule.
13.08.1000   Appeals.
13.08.1010   City council appeal.
13.08.1020   Injunction.
13.08.1030   Liability.
13.08.1035   Administrative fines.
13.08.1040   Civil penalties.
13.08.1050   Criminal penalties for certain violations.
13.08.1060   Penalties for significant noncompliance.
13.08.1070   Falsifying of information.
13.08.1075   Emergency suspensions.
13.08.1080   Termination of service.
Article 12. Special Regulations
13.08.1090   Protection from damage.
13.08.1100   Confidential information.
13.08.1110   Special agreements.