Loading...
A. The planned unit development (PUD) district is intended to encourage flexible and innovative design in the development of appropriate sites as integrated project units. Regulations for this district are designed to:
1. Allow a workable, interrelated mix of diverse land uses.
2. Encourage flexibility in design for efficiency and cost savings for the developer and the community.
3. Maximize the potential for large scale office, residential, commercial and industrial development and at the same time reduce to a minimum the impact of the development on surrounding land uses and the natural environment.
4. Encourage new development to preserve and utilize existing land characteristics and features which offer visual recreational benefits or other amenities.
5. Promote the economic, attractive, innovative and harmonious arrangement and design of new buildings, streets, utilities and other improvements or structures.
6. Provide a living, working and shopping environment within the layout of the site that contributes to a sense of community and a coherent lifestyle.
7. Provide for the creation and preservation of more and larger usable public or common open spaces than would normally be provided under conventional development.
8. Encourage the careful design and planning of larger development projects.
9. Give developers reasonable assurances regarding project approvals before the unnecessary expenditure of design efforts, while providing the city with appropriate assurances that approved PUDs will retain the character envisioned at the time of project approval.
B. Property may be reclassified to the planned unit development designation when the proposed development plan will promote the purpose of the district and this title and is formulated in conformance with the review procedures and standards of this chapter. (Ord. 52-09, 10-19-2009)
A PUD may be established on any parcel of two (2) acres or more in size for residential, office, commercial or industrial development. A PUD is required for all retail commercial uses open to the public or members which have over sixty thousand (60,000) square feet of building area. A PUD is also required for regional shopping centers, manufactured home parks, biofuels production facilities, commercial wind energy conversion systems and for all new industrial parks and all new office parks. Any structure existing at the time of adoption of this title which is expanded for retail commercial use to over sixty thousand (60,000) square feet of building area and which expansion constitutes an increase of twenty five percent (25%) or more to the building area shall be subject to this chapter, including rezoning to PUD. Such PUD district designation(s) shall be shown on the official zoning map as a P followed by a letter designating the primary use, C (commercial), O (office), I (industrial), or R (residential); i.e., PC, PO, PI, and PR. (Ord. 52-09, 10-19-2009)
Lots, uses, signs and structures shall conform to the bulk, sign, parking and any other development regulations specifically provided in the ordinance establishing the PUD; however, PUD districts established prior to adoption of this title without specific bulk, sign, parking and other development regulations shall be regulated by the regulations of the most compatible district allowing the existing uses which are in the PUD. In all PUDs the following minimum standards shall be met:
A. General Standards:
1. The density and design of the PUD shall be compatible in use, size and type of structure, relative amount of open space, traffic circulation and general layout with adjoining land uses, and shall be integrated into the neighborhood.
2. The PUD shall take into consideration the impact in existing streets and utilities.
3. The economic, environmental and neighborhood impacts of the development shall be considered.
4. The PUD shall conform to the adopted comprehensive plan.
B. Specific Standards:
1. Maximum land coverage of all buildings and impermeable areas shall be established.
2. Minimum open space shall be established and continued maintenance of the open space shall be provided in the specific PUD ordinance.
3. Minimum interior and perimeter setbacks shall be established.
4. Maximum height limitations shall be established.
5. Minimum landscape screening requirements shall be established.
6. Sign regulations for the PUD development shall be established.
7. Provision for the continued maintenance of all improvements shall be noted within the ordinance establishing the PUD district.
C. Other Conditions: Other conditions may be required, if found necessary to protect and promote the best interests of the surrounding property or the neighborhood. These conditions may include, but are not limited to, the following:
1. Improvement of traffic circulation for vehicles and pedestrians in the proposed development and adjoining properties and streets.
2. Specific landscaping/screening/lighting requirements to maintain privacy or reduce impacts in adjoining properties.
3. Joint use of private open space or amenities by adjoining property owners.
D. Natural Topography And Major Grade Changes: Due consideration shall be given to the natural topography and major grade changes shall be avoided. If the development includes hillsides and slopes, special evaluation is given to geological conditions, erosion and topsoil loss.
E. Unfavorable Development Conditions: If unfavorable development conditions exist, the zoning advisory commission and city council may restrict clearing, cutting, filling, or other substantial changes in the natural conditions of the affected area. (Ord. 52-09, 10-19-2009)
A. Preapplication Conference: Prior to any application for PUD district establishment, the applicant and/or their representative shall meet with planning services staff to determine the applicability of the development, timing of procedure, and any other information pertinent to the proposal.
B. Application And Submission Of Conceptual Development Plan: After the preapplication conference, the application for PUD district establishment shall be filed with the established filing fee with the planning services office. The application shall be submitted with a conceptual development plan, which shall include the following:
1. Legal description and address of property.
2. Name, address and phone number(s) of the property owner(s).
3. Number, type and general location of residential units.
4. General location and type of nonresidential uses including commercial, office and industrial uses.
5. List of principal permitted uses, conditional uses, accessory uses, and temporary uses.
6. General location and type of recreational (passive and active) and open space (usable and nonusable) areas.
7. Location of existing infrastructure and utilities, including: streets with appropriate grades; sidewalks; access drives; water, sanitary sewer and storm sewer drainage systems, where appropriate.
8. Proposed access to public right of way, including approximate grades, traffic projections and general indication of traffic control measures.
9. Sketches to indicate the general design of building types and the overall character of development.
10. Existing contours of the property taken at regular contour intervals.
11. Proposed parking facilities, including surface lots, ramps and loading/delivery areas.
12. Location of natural features, including woods, bluffs, waterway courses, floodways and meadows.
13. Conceptual landscape plan showing berms, plantings and fences.
14. Proposed development conditions for bulk, sign and parking regulation.
15. A location map or other framing at appropriate scale showing the general location and relation of the property to surrounding areas, including the zoning and land use pattern of adjacent properties, the existing street system in the area, and location of nearby public facilities.
16. Other information as required by the planning services department as necessary.
C. Commission Hearing: A public hearing shall be held by the zoning advisory commission on the PUD application in the same manner and with the same public notice procedure as required for zoning reclassification. (Ord. 52-09, 10-19-2009)
Loading...