Section
General Provisions
52.001 Declaration of public utility
52.002 Definitions
52.003 Fees
52.004 Sewer tapping fees
52.005 Collection of sewer service charge
52.006 Disposition of funds
52.007 Discharging drainage water in sanitary sewer prohibited
52.008 Storm sewers; approval by Water Superintendent
52.009 Certain substances in sewers prohibited
52.010 Grease, oil and sand interceptors
52.011 Maintenance of interceptors
52.012 Sewer tapping regulations
52.013 New sewers and connections
52.014 Toilet facilities required; nuisance
52.015 Discharge of septic tank waste
Use Regulations
52.025 Definitions
52.026 Stormwater discharge into sanitary sewer prohibited
52.027 Other discharges prohibited
52.028 Prohibited discharges
52.029 Unlawful discharges; actions of city
52.030 Interceptors required for greases and oil
52.031 Preliminary treatment at owner's expense
52.032 Buildings requiring manhole covers
52.033 Samplings and tests of industrial wastes
52.034 Special arrangements
52.035 Protection from damage
52.036 Powers and authority of inspectors
52.037 Notice of violation; liability; criminal and civil remedies; termination of service
Pretreatment Regulations
Part 1. General Provisions
52.045 Purpose and policy
52.046 Administration
52.047 Abbreviations
52.048 Definitions
52.049 Compliance monitoring; right of entry; inspection and sampling
52.050 Confidential information
52.051 Publication of users in significant noncompliance
52.052 Pretreatment charges and fees
Part 2. Sewer Use Requirements
52.065 Prohibited discharge standards
52.066 National categorical pretreatment standards
52.067 Local limits
52.068 City's right of revision
52.069 Dilution
Part 3. Pretreatment of Wastewater
52.080 Pretreatment facilities
52.081 Additional pretreatment measures
52.082 Accidental discharge/slug control plans
52.083 Hauled wastewater
Part 4. Wastewater Discharge Permit Application
52.095 Wastewater analysis
52.096 Wastewater discharge permit requirement
52.097 Existing connections
52.098 New connections
52.099 Permit application contents
52.100 Application signatories and certification
52.101 Wastewater discharge permit decisions
52.102 Wastewater discharge permit fee; renewal
Part 5. Wastewater Discharge Permit Issuance Process
52.115 Duration
52.116 Contents
52.117 Appeals
52.118 Modification
52.119 Transfer
52.120 Revocation
52.121 Reissuance
52.122 Regulation of waste received from other jurisdictions
Part 6. Reporting Requirements
52.135 Baseline monitoring reports
52.136 Compliance schedule progress reports
52.137 Reports on compliance with categorical pretreatment standard deadline
52.138 Periodic compliance reports
52.139 Reports of changed conditions
52.140 Reports of potential problems
52.141 Reports from unpermitted users
52.142 Notice of violation/repeat sampling and reporting
52.143 Analytical requirements
52.144 Sample collection
52.145 Timing
52.146 Record keeping
Part 7. Administrative Enforcement Remedies
52.155 Notification of violation
52.156 Consent orders
52.157 Show cause hearing
52.158 Compliance orders
52.159 Cease and desist orders
52.160 Emergency suspensions
52.161 Termination of discharge
Part 8. Judicial Enforcement Remedies
52.170 Injunctive relief
52.171 Civil damages
52.172 Remedies nonexclusive
Part 9. Supplemental Enforcement Action
52.185 Performance bonds
52.186 Water supply severance
52.187 Public nuisances
52.188 Contractor listing
Part 10. Affirmative Defenses to Discharge Violations
52.200 Upset
52.201 Prohibited discharge standards
52.202 By-pass
User Charges
52.215 Minimum charge
52.216 User charge schedule
52.217 Review and revision
52.218 Toxic pollutant charges
52.219 Publication of use rate
52.220 Charges for extraneous flows
52.221 Records
52.222 Excessive strength charges
52.223 Billing
Ground Water Infiltration and Surface Water Inflow
52.230 Definitions
52.231 Owner responsibility
52.232 Fees; charges; billing procedures
Stormwater Drainage System Service Charge
52.240 Definitions
52.241 Service charge and exemptions; rate schedule
52.242 Collection of service charge
52.243 Adjustment of charge; appeal
52.999 Penalty
Cross-reference:
Water and sewer line construction standards, see § 53.09
Development and extension of water and sewer services to non-residential property, see § 53.10
Light and Water Department, see § 32.01
Prohibited discharges and other sewer regulations, see §§ 53.20 et seq.
Permits for construction of septic tanks, see §§ 150.105 et seq.