Section
General Provisions
50.001 Director of Public Power
50.002 Name of electrical system; property of city; extensions
50.003 Injuring, interfering with system; unauthorized connections
50.004 Director to have access to premises
50.005 Application for service
50.006 Meter deposit
50.007 Consumer to protect meter; keep meter unobstructed, accessible
50.008 Rates, charges and discounts
50.009 Restitution of payment
50.010 Delinquent utility bills, termination procedures
50.011 Application of delinquent consumer for service
50.012 Using electric power from connection ahead of meter
50.013 Payment of cost of electrical connection
50.014 City not liable for damages
50.015 Adoption of electrical requirements and standards
Master Metering and Sub-Metering
50.025 Definitions
50.026 Unlawful act
50.027 Electrical energy services
Electrical Code
50.040 Application
50.041 Community Development Department; powers and duties; permits; inspections; records
50.042 Adoption of Electrical Code
50.043 Standards for electrical equipment installed in city
50.044 Supervision of work by licensed electrical contractor; permit required; exceptions
50.045 Permit required; permit fees; calls for inspection
50.046 Authority of Community Development Department as to wiring
50.047 Special permission for variance from requirements of subchapter
50.048 Connection to installation without certificate
50.049 Liability for damages
Municipal Energy Sales and Use Tax
50.060 Purpose
Distributed Generation Interconnection
50.075 Applicability
50.076 Definitions
50.077 Application
50.078 Special conditions