Section
General Provisions
52.001 Introduction
52.002 Purpose
52.003 Definitions
52.004 Authority
52.005 Administration
52.006 Appeals
52.007 Severability
Stormwater Permits; Submittal Requirements
52.015 General criteria
52.016 Sites with less than one disturbed acre unless otherwise exempt
52.017 Sites with greater than one disturbed acre
Waivers; Variances
52.030 In general
52.031 Conditions for waiver
52.032 Stormwater permit not to be issued where waiver requested
52.033 Variance
Stormwater System Design and Management Standards
52.040 Stormwater design or BMP manual
52.041 General performance criteria for stormwater management
52.042 Minimum control requirements
52.043 Stormwater management plan requirements
52.044 Sediment and erosion control plan requirements
Post Construction: General Criteria
52.055 Applicability
52.056 No untreated discharges
52.057 Channel protection
52.058 Overbank flooding protection
52.059 Extreme flooding protection
52.060 Recharge
52.061 Structural practices for water quality
52.062 Water quality volume
52.063 Hydrologic basis for design of structural practices
52.064 Sensitive areas
52.065 Hotspots
52.066 Stormwater credits
52.067 As-built plans
52.068 Easements
52.069 Landscaping and stabilization requirements
52.070 Records of installation and maintenance activities
52.071 Failure to meet or maintain design or maintenance standards
Existing Locations and Developments
52.080 Requirements
52.081 Existing problem locations
52.082 Inspection of existing facilities
52.083 Appeal of imposition of corrective measures
Illicit Discharges
52.090 Scope
52.091 Prohibition of illicit discharges
52.092 Prohibition of illicit connections
52.093 Reduction of stormwater pollutants
52.094 Notification of spills
52.095 Illicit discharge violations
52.096 Right of entry
52.998 Enforcement; violations
52.999 Penalty