(A) The stormwater management plan shall include sufficient information to allow the City of Easley’s SWMD to evaluate the environmental characteristics of the project site, the potential impacts of all proposed development of the site, both present and future, on the water resources, and the effectiveness and acceptability of the measures proposed for managing stormwater generated at the project site. The plan must show the final design specifications for all stormwater management facilities and must be sealed by a qualified individual who is licensed as follows:
(1) Registered professional engineer licensed to practice in South Carolina,
(2) Registered landscape architect, or
(3) Tier B land surveyors, as described by S.C. Code, Title 40.
(B) Plans are not required for single-family homes where a subdivision plat is not required provided:
(1) Disturbed lots are protected with properly installed silt fencing and gravel entrances, and
(2) Stormwater runoff does not damage downstream structures.
(C) The stormwater management plan shall include the following:
(1) Name of applicant;
(2) Business or residence address of applicant;
(3) Name, address and telephone number of the owner of the property;
(4) Address and legal description of subject property;
(5) Name, address and telephone number of the contractor and any subcontractors;
(6) Vicinity map;
(7) Maintenance and repair plan;
(8) Landscaping plan;
(9) Maintenance easements;
(10) Maintenance agreement;
(11) Sediment and erosion control plans;
(12) All other appropriate state or federal environmental permits.
(D) See the latest edition of the City of Easley’s Land Development Regulations and Plan Review Checklist for a complete description of each requirement.
(Ord. 2008-06, passed 4-14-08) Penalty, see § 52.999