A. The director shall determine the right-of-way and public improvement requirements applicable to each lot that is subject to the provisions of this chapter in accordance with the improvement standards; provided, however, that the right-of-way dedication requirements do not exceed twenty-five percent (25%) of the area of the lot.
B. Any additional right-of-way over that specified in subsection A of this section required by the city for the construction of the standard street width shall be the responsibility of the city and shall be obtained either through agreement with the lot owner, purchase or eminent domain proceedings.
The city council determines to acquire such additional right-of-way, the time for performance by the lot owner for the construction of the street improvements required to be constructed by the lot owner shall be extended for any period of delay necessary for the city to obtain necessary title to the remainder of the additional right-of-way.
(Ord. 1199 §1 (part))