CHAPTER 153: STORMWATER MANAGEMENT
Section
General Provisions
   153.001   Authority and title
   153.002   Purpose
   153.003   Scope
   153.004   Requirements
   153.005   Waivers
   153.006   Surveillance and compliance
   153.007   Stormwater and sediment complaint
   153.008   Plan review
   153.009   Permits
   153.010   Fees
   153.011   Assurance of completion
   153.012   Relationship to subdivision regulations
   153.013   Definitions
Stormwater Runoff Control; Management Plan
   153.030   Purpose
   153.031   Calculating stormwater runoff
   153.032   Criteria
   153.033   Methods
   153.034   Maintenance of stormwater drainage facilities and control structures
   153.035   Preparing a stormwater management plan
   153.036   Data collection
   153.037   Runoff calculations before development
   153.038   Data analysis
   153.039   Drainage system development
   153.040   Plan for runoff control
   153.041   Runoff calculations and control criteria
   153.042   Develop design details
   153.043   Submission of a stormwater management plan
   153.044   Checklist for engineering details
Drainage Plan
   153.065   Preparing a drainage plan
   153.066   Data collection
   153.067   Runoff calculations before development
   153.068   Runoff calculations and control criteria
   153.069   Plan for runoff control
   153.070   Develop design details
   153.071   Submission of a drainage plan
   153.072   Checklist for stormwater control plans
   Appendix A: Stormwater Management Procedures Flowchart
   Appendix B: Application and Permit Form
   Appendix C: Sample Site Plan for a Permit Requiring Neither a Management or Drainage Plan
Cross-reference:
   Storm water utility charge, see § 52.01