Section
General Provisions
153.001 Authority and title
153.002 Purpose
153.003 Scope
153.004 Requirements
153.005 Waivers
153.006 Surveillance and compliance
153.007 Stormwater and sediment complaint
153.008 Plan review
153.009 Permits
153.010 Fees
153.011 Assurance of completion
153.012 Relationship to subdivision regulations
153.013 Definitions
Stormwater Runoff Control; Management Plan
153.030 Purpose
153.031 Calculating stormwater runoff
153.032 Criteria
153.033 Methods
153.034 Maintenance of stormwater drainage facilities and control structures
153.035 Preparing a stormwater management plan
153.036 Data collection
153.037 Runoff calculations before development
153.038 Data analysis
153.039 Drainage system development
153.040 Plan for runoff control
153.041 Runoff calculations and control criteria
153.042 Develop design details
153.043 Submission of a stormwater management plan
153.044 Checklist for engineering details
Drainage Plan
153.065 Preparing a drainage plan
153.066 Data collection
153.067 Runoff calculations before development
153.068 Runoff calculations and control criteria
153.069 Plan for runoff control
153.070 Develop design details
153.071 Submission of a drainage plan
153.072 Checklist for stormwater control plans
Appendix A: Stormwater Management Procedures Flowchart
Appendix B: Application and Permit Form
Appendix C: Sample Site Plan for a Permit Requiring Neither a Management or Drainage Plan
Cross-reference:
Storm water utility charge, see § 52.01