§ 153.068 RUNOFF CALCULATIONS AND CONTROL CRITERIA.
   In most cases for small sites, the developer will know how the surface of the site is to be developed. He or she can then go directly to calculation of increase of runoff and determination of runoff criteria following the steps in § 153.040.
(Ord. 16-96, passed 4-15-1996)