§ 153.071 SUBMISSION OF A DRAINAGE PLAN.
   The plan submission shall consist of three parts, a narrative, site plan, and engineering details. The narrative verbally describes the site, the project, and the control practices to be employed. The site plan is a series of maps pictorially explaining the information in the narrative. The engineering details are detail drawings, calculations, and specifications on the drainage facilities and control structures to be constructed as part of the development.
(Ord. 16-96, passed 4-15-1996)