NARRATIVE | |
___________ | Project description - Briefly describe the nature and purpose of the land disturbing activity and the amount of grading involved. |
___________ | Existing site conditions - A description of the existing topography, vegetation, and drainage. |
___________ | Runoff control measures - A description of the methods which will be used to control runoff on the site. |
___________ | Maintenance - A schedule of regular inspection and repair of erosion and sediment control structures should be set forth. |
___________ | Calculations - Runoff calculations |
SITE PLAN | |
___________ | Vicinity map - A small map locating the site in relation to the surrounding area. |
___________ | Existing contours - The existing contours of the site should be shown on a map. |
___________ | Existing vegetation - The existing tree lines, grassy areas, or unique vegetation should be shown on a map. |
___________ | Soils - The boundaries of the different soil types should be shown on a map. |
___________ | Indicate north - The direction of north in relation to the site should be shown. |
___________ | Existing drainage patterns - The dividing lines and the direction of flow for the different drainage areas should be shown on a map. |
___________ | Development plan - Location and size of all areas to be rendered impervious. |
___________ | Limits of clearing and grading - Areas which are to be cleared and graded should be outlined on a map. |
___________ | Location of drainage facilities and control structures - The locations of the drainage facilities and control structures to be used on the site should be shown on a map. Facilities or structures subject to § 153.034 shall be delineated. |
ENGINEERING DETAILS | |
The following shall be submitted for drainage facilities or control structures to be constructed: | |
___________ | Design calculations |
___________ | Design drawings |
___________ | Specifications |
___________ | Quantities |
(Ord. 16-96, passed 4-15-1996)