(a) The fee for a certificate of occupancy for all buildings and structures shall be fifty dollars ($50.00).
(b) The fee for a temporary certificate of occupancy for all buildings and structures shall be one hundred fifty dollars ($150.00), provided that such building or structures meets all requirements for the issuance of a Temporary Certificate of Occupancy.
(Ord. 02-476. Passed 12-17-02.)
The fee for a permit to erect, re-erect, alter, repair, place, replace, hang, rehang, locate, relocate or in any manner display or re-display a sign or outdoor advertising display shall be based on the total display area of each face of the sign or outdoor advertising display as follows:
(a) | All on-site identifying formal or informal billboard, projecting, wall or free standing signs | $20.00 plus .60 per sq. ft. of display area |
(b) | Temporary signs [to be displayed not more than thirty (30) days in one (1) year] | $20.00 |
The federal and state governments and their political subdivisions shall be exempt from paying the sign fees imposed under this section.
(Ord. 98-237. Passed 7-14-98.)
The fee for a permit to install a pool over thirty-six (36) inches deep shall be thirty dollars ($30.00) plus additional charges as follows:
(a) | Plan review if required | $ 50.00 |
(b) | Residential above-ground pool | $ 45.00 |
(c) | Residential in-ground pool (unheated) | $ 90.00 |
(d) | Residential in-ground pool (heated) | $135.00 |
(e) | Commercial pool | $135.00 |
(f) | Electric (above-ground) | $ 45.00 |
(g) | Electric (in-ground) | $ 90.00 |
(h) | Zoning | $ 5.00 |
(i) | Commercial 3 percent OBBS fee | based on subtotal of pool fees |
(Ord. 02-476. Passed 12-17-02.)
To move a building from one (1) location to another on or across a public street or public alley, a fee shall be paid to the Department of Inspection Services as follows:
Frame Building (dimensions in feet) | |
Not over 12' high or 12' wide or 22' long | None |
Not over 12' high or 20' wide or 22' long | $ 50.00 |
Over 12' high but not over 20' wide or 22' long | $100.00 |
Not over 2-1/2 stories, but over 20' wide or 22' long | $200.00 |
See Chapter 1325 for special requirements.
(Ord. 88-467. Passed 8-2-88.)
(a) Application fee |
$ 40.00 |
(b) Plan review | |
Commercial |
$100.00 |
Residential |
$ 20.00 |
(c) Services | |
New (3) |
$135.00 |
Underground--French (1) |
$ 45.00 |
Sub panels--1 to 10 |
$ 5.00 each |
Sub panels--11 and over |
$ 1.00 each |
Upgrade (1) |
$ 45.00 |
Reconnect (1) |
$ 45.00 |
Temporary (1) |
$ 45.00 |
(d) Alterations/repairs (1) |
$ 45.00 |
New circuits--1 to 10 |
$ 3.00 each |
New circuits--11 and over |
$ 1.00 each |
Sub panels--1 to 10 |
$ 5.00 each |
Sub panels--11 and over |
$ 1.00 each |
(e) Commercial refrigeration (1) |
$ 45.00 |
(f) Sign circuits (1) |
$ 45.00 |
(g) Pools | |
Above-ground (1) |
$ 45.00 |
In-ground (+1) (2) |
$ 90.00 |
(h) Informational inspections |
$ 45.00 |
(i) Investigation fee |
$200.00 |
(j) Additional inspections |
$ 45.00 |
(k) Commercial 3 percent OBBS fee |
based on subtotal of fees |
NOTES: 1. Permit holder is responsible for scheduling the final inspection.
2. Commercial permit applications must include fault current calculations and a one-line diagram.
3. An additional $45.00 reinspection fee may be imposed for work that was not properly installed, was not ready for inspection, had changed from the approved plans, or was not accessible at the time of the inspection.
4. Numbers in parenthesis indicate the number of inspections provided.
(Ord. 06-286. Passed 7-25-06.)
(a) Application fee |
$ 40.00 |
(b) Plan review | |
Commercial |
$100.00 |
Residential |
$ 20.00 |
(c) Heating/cooling | |
New furnace/air handler (2) |
$ 90.00 |
Replacement furnace/air handler (2) |
$ 45.00 |
Unit/radiant heaters (1) |
$ 45.00 |
Additional units |
$ 2.00 each |
AC/heat pump (1) |
$ 45.00 |
Package rooftop units (1) |
$ 45.00 |
Ductwork/alteration (1) |
$ 45.00 |
(d) Fireplace (wood or gas) | |
Solid fuel appliance (1) |
$ 45.00 |
Chimney or Chimney Liner (1) |
$ 45.00 |
(e) Ventilation equipment (1) |
$ 45.00 |
(f) Commercial refrigeration |
$ 45.00 |
(g) Informational inspections |
$ 45.00 |
(h) Additional inspections |
$ 45.00 |
(i) Investigation fees |
$200.00 |
(j) Commercial 3 percent OBBS fee |
based on subtotal of fees |
(k) Range hoods |
$250.00 |
NOTES: 1. Permit holder is responsible for scheduling the final inspection.
2. Numbers in parenthesis indicate the number of inspections provided.
3. An additional $45.00 reinspection fee may be imposed for work that was not properly installed, was not ready for inspection, had changed from approved plans or was not accessible at the time of the inspection.
(Ord. 06-286. Passed 7-25-06.)
(a) Application fee |
$ 40.00 |
(b) Plan review | |
Commercial |
$100.00 |
Residential |
$ 20.00 |
(c) Alarm | |
New system |
$150.00/ 10,000 sq. ft. or pt. |
Replace panel |
$150.00/ 10,000 sq. ft. or pt. |
Supervision for tamper/flow (only) |
$ 85.00 |
(d) Detection (not part of a new system) | |
Duct smoke detectors |
$ 45.00 each ($135 maximum) |
Additional devices in existing building |
$ 45.00 each ($135 maximum) |
Supervision for tamper/flow (only) |
$ 85.00 |
(e) Suppression | |
Sprinklers (1 to 4) |
$100.00 |
Sprinklers (5 to 20) |
$150.00 |
Sprinklers (21 to 200) |
$250.00 |
Sprinklers (201 to 300) |
$300.00 |
Sprinklers (301 to 400) |
$350.00 |
Sprinklers (401 to 750) |
$450.00 |
Sprinklers (over 750) |
$450.00 (plus $.50 per sprinkler over 750) |
Range hood suppression |
$250.00 |
Other suppression systems |
$250.00 |
(f) Informational inspections |
$ 45.00 |
(g) Additional inspections |
$ 45.00 |
(h) Investigation fee |
$200.00 |
(i) Commercial 3 percent OBBS fee |
based on subtotal of fees |
NOTES: 1. Permit holder is responsible for scheduling the final inspection.
2. An additional $45.00 reinspection fee may be imposed for work that was not properly installed, was not ready for inspection, had changed from approved plans or was not accessible at the time of the inspection.
(Ord. 06-286. Passed 7-25-06.)