(a) Application fee |
$ 40.00 |
(b) Plan review | |
Commercial |
$100.00 |
Residential |
$ 20.00 |
(c) Services | |
New (3) |
$135.00 |
Underground--French (1) |
$ 45.00 |
Sub panels--1 to 10 |
$ 5.00 each |
Sub panels--11 and over |
$ 1.00 each |
Upgrade (1) |
$ 45.00 |
Reconnect (1) |
$ 45.00 |
Temporary (1) |
$ 45.00 |
(d) Alterations/repairs (1) |
$ 45.00 |
New circuits--1 to 10 |
$ 3.00 each |
New circuits--11 and over |
$ 1.00 each |
Sub panels--1 to 10 |
$ 5.00 each |
Sub panels--11 and over |
$ 1.00 each |
(e) Commercial refrigeration (1) |
$ 45.00 |
(f) Sign circuits (1) |
$ 45.00 |
(g) Pools | |
Above-ground (1) |
$ 45.00 |
In-ground (+1) (2) |
$ 90.00 |
(h) Informational inspections |
$ 45.00 |
(i) Investigation fee |
$200.00 |
(j) Additional inspections |
$ 45.00 |
(k) Commercial 3 percent OBBS fee |
based on subtotal of fees |
NOTES: 1. Permit holder is responsible for scheduling the final inspection.
2. Commercial permit applications must include fault current calculations and a one-line diagram.
3. An additional $45.00 reinspection fee may be imposed for work that was not properly installed, was not ready for inspection, had changed from the approved plans, or was not accessible at the time of the inspection.
4. Numbers in parenthesis indicate the number of inspections provided.
(Ord. 06-286. Passed 7-25-06.)