Section
General Provisions
151.001 Authority
151.002 Purpose
151.003 Applicability
151.004 Fee in lieu of detention
151.005 Definitions
General Submittal Requirements
151.015 Minimization of increase in runoff volumes and rates
Water Quality
151.030 Compliance
151.031 Construction site stormwater runoff control
151.032 Stormwater Management Plan
151.033 Multiple uses
151.034 Stormwater Management Plan submittal requirements
151.035 Maintenance responsibility
Design Standards
151.045 Applicability
151.046 Release rates
151.047 Detention basin outlet/control structure design
151.048 Detention storage requirements
151.049 Stormwater management system design and evaluation
151.050 Methods for generating runoff hydrographs
151.051 Dry detention basin design
151.052 Wet detention basin design
151.053 Detention in floodplains
151.054 Drainage into wetlands and depressional storage areas
151.055 Street, parking lot and underground storage
151.056 Culvert design
151.057 Safety considerations
151.058 Maintenance considerations
151.059 Soil erosion and sediment control
Additional Considerations
151.070 Flow from upstream tributary areas
151.071 Regional detention evaluation
151.072 Early completion of stormwater management facilities
Administration; Enforcement
151.085 Inspections
151.086 Variances
151.087 Appeals
151.088 Enforcement
151.999 Penalty