CHAPTER 53: WATER AND SEWERS
Section
General Provisions
   53.001   Definitions
   53.002   Abbreviations
   53.003   Severability
   53.004   Conflict
   53.005   Effective date
   53.006   Watershed protection
Connections
   53.020   Required
   53.021   Connections to be separate
   53.022   Connection charge
   53.023   Where to be made
   53.024   Sewer not to connect to storm sewer
   53.025   Construction
   53.026   Outside city limits
   53.027   Authority to discontinue connection
   53.028   Charges for service
   53.029   Swimming pool water
Extensions
   53.040   Application for extensions
   53.041   Extension requirements
   53.042   Financing extensions
   53.043   Specifications, ownership
Use of Public Sewers Required
   53.055   Depositing objectionable wastes on public or private property prohibited
   53.056   Construction or maintenance of privies, septic tanks, cesspools and the like prohibited
   53.057   Owner to furnish, install and connect toilet facilities
Private Sewage Disposal
   53.070   Connection to private system permitted
   53.071   Construction of private system; permit required
   53.072   When permit effective; inspection required
   53.073   Compliance with state regulations required; denial of permit
   53.074   Owner to operate private systems in sanitary manner
   53.075   Connection to public sewer when available required; filling of septic tanks and private systems required
   53.076   Requirements not to interfere with requirements imposed by Health Officer
Building Sewers and Connections
   53.090   Uncovering of connection to or opening into public sewer by unauthorized person prohibited
   53.091   Building sewer permits; classes, application
   53.092   Costs to be borne by owner; indemnification of city for loss or damage
   53.093   Separate connections for each building required, with exception
   53.094   When old building sewers may be used
   53.095   Material to be used in constructing building sewer; specifications
   53.096   Size and slope of building sewer subject to Director’s approval
   53.097   Location and entrance of building sewer
   53.098   Excavations, pipe laying and backfill
   53.099   Joints and connections
   53.100   Lifting sanitary sewage by artificial means permitted
Restrictions on Use of Public Sewers
   53.115   Prohibitions; limitations
   53.116   Hauled wastewater
Pretreatment
   53.130   Purpose and policy
   53.131   Definitions and abbreviations
   53.132   Prohibited discharge standards
   53.133   National categorical pretreatment standards
   53.134   Local limits
   53.135   State requirements
   53.136   Right of revision
   53.137   Dilution
   53.138   Pretreatment of wastewater
   53.139   Accidental discharge/slug control plans
   53.140   Hauled wastewater
   53.141   Fees
   53.142   Pretreatment program administration charges
   53.143   Wastewater discharge permit
   53.144   Baseline monitoring reports
   53.145   Compliance schedule progress reports
   53.146   Reports on compliance with categorical standards; deadline
   53.147   Periodic compliance reports
   53.148   Reports of changed conditions
   53.149   Reports of potential problems
   53.150   Reports from unpermitted users
   53.151   Notice of violation
   53.152   Analytical requirements
   53.153   Compliance monitoring
   53.154   Confidential information
Enforcement
   53.165   Administrative remedies
   53.166   Civil penalties
   53.167   Other available remedies
   53.168   Remedies non-exclusive
   53.169   Publication of significant non-compliance
   53.170   Adjudicatory hearings
   53.171   Affirmative defenses to discharge violations
Water Shortage Response Plan
   53.185   Authorization
   53.186   Notification
   53.187   Levels of response
   53.188   Triggers
   53.189   Enforcement
   53.190   Public comment
   53.191   Variance protocols
   53.192   Effectiveness
   53.193   Revision
 
   53.999   Penalty