§ 53.023 WHERE TO BE MADE.
   (A)   Every sewer connection shall be made at the “Y” or “T” provided for the lot to be served. If no “Y” or “T” has been provided for the lot, then the connection will be made at a point selected by the Director to best serve that lot, unless a location is chosen by the owner and is acceptable to the Director.
   (B)   No sanitary sewer shall be connected to a storm water sewer, nor shall any storm water, of any description, to be added to any sanitary sewer.
(Ord. 01-19, passed 3-27-2001)