Loading...
A. Whenever boundary monuments are required, such monuments shall be set on the exterior boundary of the subdivision at all corners, angle points, beginnings and ends of curves and at intermediate points approximately one thousand (1,000) feet apart. The locations of inaccessible points may be established by ties and shall be noted on the final map or parcel map.
B. All exterior boundary monuments shall be set prior to recordation of the final map or parcel map or as certified to on the final map.
(Ord. 2591 (part))
Whenever interior monuments are required, such monuments shall be set at all block and lot corners and angle points and at the beginnings and ends of curves, at points of intersection with centerlines of other existing and proposed streets and alleys and at the points of intersection with the exterior boundary lines. Interior property line and centerline monuments and ties may be set after the final map or parcel map is recorded.
(Ord. 2591 (part))
All monuments set as required herein shall be permanently and visibly marked or tagged with the registration or license number of the engineer or surveyor who signs the engineer's or surveyor's certificate and under whose supervision the survey is made.
(Ord. 2591 (part))
The following survey data and information shall be shown on each final map or parcel map for which a field survey was made pursuant to the provisions of these regulations:
A. Stakes, monuments (together with their precise position) or other evidence found on the ground, to determine the boundaries of the subdivision;
B. Corners of all adjoining properties identified by lot and block numbers, subdivision names, numbers and pages of record, or by section, township and range, or other proper designation;
C. All information and data necessary to locate and retrace any point or line without unreasonable difficulty;
D. The location and description of any required monuments to be set after recordation of the Final Map, and the statement that they are "to be set";
E. Bearing and length of each lot line, block line and boundary line and each required bearing and distance;
F. Length, radius and angle of each curve and the bearing of each radial line to each lot corner on each curve;
G. The centerlines of any street or alley in or adjoining the subdivision which have been established by the public works director, together with reference to a field book or map showing such centerline and the monuments which determine its position. If determined by ties, that fact shall be so stated;
H. Such other survey data or information as maybe required to be shown by the public works director or by the provisions of this chapter.
(Ord. 2591 (part))
Unless waived by the public works director, monuments, complying with the requirements for a parcel map as set forth in the Subdivision Map Act, shall be established prior to recording a certificate of compliance for a plat map or lot line adjustment.
(Ord. 2591 (part))
Loading...