Loading...
18.12.010   Survey procedure and practice.
   The procedure and practice of all survey work done on any subdivision, shall conform to the standard practices and principles of land surveying, the Land Surveyor's Act of the state of California, and the provisions of this chapter.
(Ord. 2591 (part))
18.12.020   Traverse.
   The traverse of the exterior boundaries of the subdivision computed from field measurements of the ground must close within a limit of error of one foot to ten thousand feet (1' to 10,000') of perimeter before balancing survey.
(Ord. 2591 (part))
18.12.030   Field notes.
   When required by the public works director, the engineer or surveyor shall prepare complete field notes, in a form satisfactory to the public works director showing references, ties, locations, elevations and other necessary data relating to monuments, and shall submit such notes to the public works director to be indexed and retained as a part of the permanent public record of the public works' department.
(Ord. 2591 (part))
18.12.040   Geodetic monuments.
   Whenever the public works director has established a system of coordinates which is within a reasonable distance of the subdivision boundary, the field survey shall be tied into such system.
(Ord. 2591 (part))
18.12.050   Monuments.
   In making the survey of the subdivision, the engineer or surveyor shall set sufficient permanent monuments so that the survey may be readily retraced.
(Ord. 2591 (part))
18.12.060   Boundary monuments.
   A.   Whenever boundary monuments are required, such monuments shall be set on the exterior boundary of the subdivision at all corners, angle points, beginnings and ends of curves and at intermediate points approximately one thousand (1,000) feet apart. The locations of inaccessible points may be established by ties and shall be noted on the final map or parcel map.
   B.   All exterior boundary monuments shall be set prior to recordation of the final map or parcel map or as certified to on the final map.
(Ord. 2591 (part))
18.12.070   Interior monuments.
   Whenever interior monuments are required, such monuments shall be set at all block and lot corners and angle points and at the beginnings and ends of curves, at points of intersection with centerlines of other existing and proposed streets and alleys and at the points of intersection with the exterior boundary lines. Interior property line and centerline monuments and ties may be set after the final map or parcel map is recorded.
(Ord. 2591 (part))
18.12.080   Monument type and positioning.
   All monuments set in the course of the survey, as required by these regulations, shall be of the type specified in the improvement standards and shall be set to the depth and in the manner prescribed by the director.
(Ord. 2591 (part))
18.12.090   Monument identification marks.
   All monuments set as required herein shall be permanently and visibly marked or tagged with the registration or license number of the engineer or surveyor who signs the engineer's or surveyor's certificate and under whose supervision the survey is made.
(Ord. 2591 (part))
Loading...