Chapter 16R.22
GRADING STANDARDS
Section:
16R.22.010   Adoption of standards.
16R.22.020   Sediment control.
16R.22.030   Grading practices and setbacks.
16R.22.040   Control of runoff.
16R.22.050   Revegetation and slope surface stabilization.
16R.22.060   Protection of watercourses.
16R.22.070   Disposal of cleared material and fill.
16R.22.080   Excavated materials.
16R.22.090   Completion of work.
16R.22.010   Adoption of standards.
   The following regulations shall constitute the grading standards of the City and shall apply to and govern the forms of any grading work in the city in accordance with the provisions of Section 16.26.020 of this code:
   A.   All regulations set forth in Section 1803, Section 1803A, and Appendix J of the International Building Code, 2021 Edition, as published by the International Code Council (“IBC”);
   B.   All regulations adopted in the 2022 California Building Code (“CBC”), as promulgated in Part 2, Title 24 of the California Code of Regulations, including all regulations adopted in the CBC amending or repealing a volume, chapter, section or appendix of the IBC, which regulations shall take precedence over the amended or repealed volume, chapter, section or appendix of the IBC; and
   C.   All regulations adopted in this chapter, including any regulations adopted in this chapter amending volumes, chapters, sections or appendices of the IBC, shall take precedence over the amended volumes, chapters, sections or appendices of the IBC.
(Res. No. 103 90-91 §1 (part), Res. No. 41 92-93 §6, Res. No. 139-07, Ord. No. 2540 §11, Ord. No. 2577 11-15-22 §11)
16R.22.020   Sediment control.
   A.   Sediment caused by the grading project shall be retained on the site to the greatest extent feasible. The maximum permanent rate of sediment loss after completion of the project should not exceed the natural erosion rate which occurred prior to the grading project. If, in the opinion of the building official, excessive erosion occurs from the project, erosion and sediment control measures shall be immediately implemented to reduce erosion to allowable levels.
   B.   If required by the building official, sediment basins, sediment traps, or similar sediment control measures, temporary or permanent, shall be installed prior to clearing and grading operations. Upon completion of construction and stabilization of soils, all temporary erosion control facilities shall be removed from the site upon written approval of the building official.
(Res. No. 103 90-91 §1 (part), Ord. No. 2540 §11, Ord. No. 2577 11-15-22 §11)