In order to prevent polluting discharges from occurring, approved erosion and sediment control devices shall be required for all grading and filling. Control devices and measures which may be required include, but are not limited to, the following:
A. Energy absorbing devices to reduce the velocity of runoff water;
B. Sedimentation controls, such as sediment debris basins and sediment traps. Trapped sediment shall be removed to a site approved by the building official;
C. Disposal of water runoff from developed areas over large undisturbed areas;
D. Multiple discharge points to reduce the volume of runoff over localized areas.
(Res. No. 103 90-91 §1 (part), Ord. No. 2540 §11, Ord. No. 2577 11-15-22 §11)