Loading...
Fees for plumbing permits and inspections are as follows:
(a) Permit Fees.
Minimum fee $ 80.00
If additional inspections are required after rough and final, an additional fee of $60.00 be charged.
Base permit fee 60.00
Fixtures, stack vents, conductors 15.00 each
Sub-floor drains 15.00 each
Condensate drains 15.00 each
Storm sumps, sewage ejectors 15.00 each
Reduced pressure and backflow preventor* 50.00 each
* commercial
Water-connected appliances, equipment,
devices $ 15.00 each
Floor drains, special drains, traps 15.00 each
Laboratory, hospital, clinic fixtures,
equipment devices 15.00 each
Grease traps 15.00 each
Lawn sprinkler system 50.00
Chimney liner 25.00
(b) Storm and Sanitary Sewer
Installations/Residential. $ 50.00 each
(c) Building Sewer to Building Drain Connections.
For each connection when a new sewer
and/or main drain is installed $ 50.00 each
(d) Water Distribution Systems; Service Line:
Residential $ 50.00
Commercial 100.00
(e) Work Without Permit.
Permit not obtained before work is started double fee, plus $100.00
(f) Special Inspections.
Certificate of occupancy and compliance $70.00
One special inspection or one investigation
not specifically covered in this section 70.00
(g) Appeals Filed With Plumbing Board of Appeals. $ 150.00
(Ord. 99-14. Passed 6-1-99; Ord. 2002-25. Passed 6-18-02; Ord. 2005-25. Passed 6-21-05; Ord. 2009-11. Passed 6-16-09; Ord. 2012-06. Passed 6-19-12; Ord. 2013-04. Passed 6-18-13; Ord. 2014-06. Passed 7-1-14.)
Fees for mechanical permits and inspections are as follows:
Minimum Fee: $ 80.00
If additional inspections are required after rough and final, an additional inspection fee of $60.00 will be charged.
(a) Base Permit Fee. 60.00
(b) Gas Burning Equipment (New and/or Conversion).
Under 400,000 BTU $ 50.00
Over 400,000 BTU 100.00
Chimney liners 25.00
(c) Oil Burners (New and/or Conversion, Except Boilers).
Under 5 gal./hr. $ 60.00
Over 5 gal./hr. 70.00
(d) Solid Fuel-Burning Equipment; Fireplace
Inserts. $ 60.00
(e) Solar Equipment; Commercial and Residential
(Piping Fee Included).
Each panel collector system $ 75.00
(f) Air Conditioning Units (Piping Fee Included).
1-1/2 H.P. to 5 H.P. (self-contained or split) $ 45.00
Over 5 H.P. 70.00
Centrifugal units 80.00
Absorption units 80.00
Cooling towers 75.00
(g) Cold Air Return; Heat Supply Modifications.
Residential $ 45.00/per unit
Commercial 70.00
(h) Refrigeration Systems.
Self-contained units up to 5 H.P. (split
systems) $ 45.00
Over 5 H.P. 80.00
Refrigeration tubing 25.00
(i) Air Handlers, Multi-Zone, Self-Contained Units.
Ventilation and exhaust fans:
Up to 10,000 CFM $ 45.00
Over 10,000 CFM 75.00
Through-the-wall fan coil vents 20.00
(j) Unit Heaters; Hot Water or Steam.
Under 400,000 BTU's input $ 45.00
400,000 BTU's input and over 70.00
(k) Humidifiers.
Residential $ 20.00
Commercial 50.00
(l) Electronic Air Cleaner.
Electronic Air cleaner/residential $ 20.00
Commercial/industrial building 50.00
(m) Work Without Permit.
Permit not obtained before work is started double fee, plus $100.00
(n) Special Inspections.
Certificate of occupancy or compliance $ 70.00
One special inspection or one investigation not
specifically covered in this schedule 70.00
(o) Gas Piping (Includes Pressure Testing).
Residential (20-30 psi) $ 45.00
Commercial (under 2 in. pipe size)
(30-40 psi) 70.00
Commercial (2 in. or over pipe size)
(over 40 psi) 100.00
(p) Duct Work Only.
Residential $ 45.00
Commercial 70.00
Note: For heating and cooling, two permits must be obtained
(q) Fire Dampers.
First 5 $ 10.00 each
Over 5 5.00 each
(r) Appeals Filed With Mechanical/Building
Construction Board of Appeals. $ 150.00
(s) Fire Suppression Systems Utilizing
15 Heads or Less.** $ 150.00
Additional sprinkler heads 5.00
** Includes hydrostatic test and fire suppression test
(t) Kitchen Hood Ventilation System (Commercial). $ 50.00
(u) Water Heater. $ 15.00.
(Ord. 99-14. Passed 6-1-99; Ord. 2002-25. Passed 6-18-02; Ord. 2004-02. Passed 6-15-04; Ord. 2009-11. Passed 6-16-09; Ord. 2012-06. Passed 6-19-12; Ord. 2013-04. Passed 6-18-13; Ord. 2014-06. Passed 7-1-14.)
Fees for general permits and licenses are as follows:
(a) Storage or parking of inoperable vehicle, 30-day permit $25.00
(b) Mechanical and electronic amusement devices, per year:
First device $100.00
Each additional device 25.00
(c) Materials recovery operator or materials recovery facility license, per year $300.00
(d) Ice cream vending license, per year:
Truck $75.00
Each driver 30.00
(e) Motorcycle rental agency, per year $125.00
(f) Reclaim shopping carts, each $10.00
(g) Billiard tables, per year:
First table $75.00
Each additional table 40.00
(h) Bowling alleys, per year:
First alley $75.00
Each additional alley 40.00
(i) Taxicabs, per year, each $50.00
(j) Taxicab driver license fee, per year $25.00
(k) Taxicab meter inspection fee:
Without sealing $10.00
With sealing 15.00
(l) Dog licenses:
From January 1 to February 28 $18.00
Neutered dogs, January 1 to February 28 10.00
After February 28 30.00
(Except animal under six months, ownership under ten days)
Neutered dogs, after February 28 20.00
License transfer or replacement of lost tags 1.00
(Ord. 2017-02. Passed 5-16-17.)
(m) Dog kennel license $125.00
(n) Vendor permit:
Door-to-door vending (up to four times per year) $50.00
Each additional vendor
(with each principal license up to four times per year) 5.00
Private property vending 75.00 per location
(o) Christmas tree sales $75.00
(p) Shows, carnivals and exhibitions $200.00
(Ord. 99-14. Passed 6-1-99; Ord. 2001-01. Passed 1-2-01; Ord. 2002-03. Passed 2-5-02; Ord. 2002-25. Passed 6-18-02; Ord. 2004-02. Passed 6-15-04; Ord. 2007-05. Passed 3-20-07; Ord. 2007-09. Passed 6-5-07; Ord. 2015-02. Passed 1-6-15.)
Zoning, land use and community development fees are as follows:
Service | Wayne Fee |
Service | Wayne Fee |
Site Plan Review | $400.00 - $1,000.00 |
Zoning Change | $1,000.00 |
Zoning Change PRD and PDD | $1,400.00 |
Vacation of Street | $300.00 |
Vacation of Alley | $150.00 |
Lot Split | $300.00 |
ZBA Appeal Residential | $300.00 |
ZBA Appeal Commercial | $400.00 |
ZBA Appeal Regulated Use | $1,200.00 |
ZBA Special Meeting- Residential | $400.00 |
ZBA Special Meeting- Commercial | $600.00 |
ZBA Special Meeting- Regulated Use | $1,300.00 |
ZBA Temporary Permit Renewal | $150.00 |
Preliminary Plat Approval | $1,250.00 |
Act 255 CFE | $1,000.00 |
Zoning Compliance Application | $350.00 |
Zoning Permit Review | $100.00 |
Special Land Use Existing Building | $1,000.00 |
Special Land Use New Development | $1,500.00 |
Conditional Zoning Agreement | $1,000 + recording fee |
Zoning Verification Letter | $50.00 |
Food Truck/Cart Permit | $75.00 |
(Ord. 99-14. Passed 6-1-99; Ord. 2002-25. Passed 6-18-02; Ord. 2003-08. Passed 6-3-03; Ord. 2004-02. Passed 6-15-04; Ord. 2005-25. Passed 6-21-05; Ord. 2009-01. Passed 1- 6-09; Ord. 2009-11. Passed 6-16-09; Ord. 2009-16. Passed 11-17-09; Ord. 2023-02. Passed 2-7-23.)
Loading...