The following fees shall be paid by the applicant for the occupancies and items listed below at the time an application is made and/or at the time such fees are determined, but in any event no later than at the time of issuance of the permit:
Table 1420.02.1-RESIDENTIAL | |||
RESIDENTIAL 1, 2 & 3 FAMILY DWELLING PERMIT FEES a,b,c,d,e,f | |||
New 1, 2 & 3 Family a | ADDITIONS a | ALTERATIONS a | |
Building Permit | GA x SFCT x 0.011 = PF | GA x SFCT x 0.011 = PF | Value Range Table |
Electrical Permit | 12% x PF | 12% x PF | Included |
HVAC Permit | 12% x PF | 12% x PF | Included |
Plumbing Permit | 12% x PF | 12% x PF | Included |
1% State Tax | Plus 1% of all the fees above b | Plus 1% of all the fees above b | Plus 1% of all the fees above b |
Building Plan Review Fee | 12% x PF, $50.00 minimum | 12% x PF, $50.00 minimum | 12% x PF, $50.00 minimum |
Engineering TOPO Review Fees | 12% x PF | 12% x PF | N/A |
Engineering Inspection Fees | 12% x PF | 12% x PF | N/A |
Grading Compliance Deposit | $800.00 | N/A | N/A |
Sewer Cap Fee | Sewer Cap Range Table f | N/A | N/A |
Tree Planting Fee | Tree Planting Range Table d | N/A | N/A |
Recreation Cap Improvement Fee | $800.00 e | N/A | N/A |
Right of Way Deposit | $400.00 | N/A | N/A |
Excessive Loads Fee | $100.00 | N/A | N/A |
Compliance Deposit | $500.00 | $500.00 selectable based on scope | $500.00 selectable based on scope |
Certificate of Occupancy/Completion | $100.00 | $100.00 | $100.00 |
Total permit fees | Total permit fees | Total permit fees | |
Table 1420.02.1-RESIDENTIAL | ||
RESIDENTIAL MISCELLANEOUS FEES b,c,d,f | ||
Electrical Permit | $100.00 Flat Fee plus 1% State Tax b | |
HVAC Permit | $100.00 Flat Fee plus 1% State Tax b | |
Plumbing Permit | $100.00 Flat Fee plus 1% State Tax b | |
Deck | Value Range Table c ( x 50%) = PF b | Includes building and topographical review |
Shed | Value Range Table c (x 50%)=PF, $50.00 minimum | Includes building and topographical review |
Pool/Spa Above Ground | $100.00 Flat Fee b | Includes building, electrical and gas if applicable |
In-ground Pool | $200.00 Flat Fee b | Includes building, electrical, topographical review and gas if applicable |
Siding | $50.00 Flat Fee | |
Miscellaneous | Value Range Table c (x 50%)=PF | |
Driveway/Apron | $50.00 Flat Fee b | Includes building, engineering and topographical review |
Sidewalk | $50.00 Flat Fee b | Includes building, engineering and topographical review |
Reroof | $50.00 Flat Fee b | |
Sewer | $50.00 Flat Fee b | |
Rain Barrel/Water Garden | $50.00 Flat Fee b | |
Dye Test Inspection | $50.00 Flat Fee b | |
Waterproofing | $100.00 Flat Fee b | |
Water Control | $50.00 Flat Fee b | |
Fence | Value Range Table c (x 50%)=PF | |
Hot Water Tank | $50.00 Flat Fee b | |
Residential Demolition Building | $50.00 Flat Fee b | |
Residential Demolition Engineering | $50.00 Flat Fee | |
a. Building Valuation Data or “BVD” published by the International Code Council utilizes the “average construction costs per square foot table” and is one of the factors used for determining permit cost in the City of Strongsville. The average construction cost per square foot table presents factors that reflect relative value of one construction classification/occupancy group to another so that more expensive construction is assessed greater permit fees than less expensive construction.
b. A 1% fee is added to the building, electrical, mechanical and plumbing permits that are governed by the Residential Code of Ohio, pursuant to H.B. 175 and sections 103.2.4.2 and 103.2.4.1 of Rule 4101:8-1-03 of the Ohio Administrative Code adopted by the Board of Building Standards.
c. Refer to the Building Value Range Table 1420.02.3 for appropriate permit fees.
d. Refer to the Tree Planting Fund Range Table 1420.02.5 for appropriate permit fees.
e. Recreation capital improvement fee as determined by Strongsville C.O. 1224.06 and Planning Commission Approval.
f. Sewer Capitalization Rate Range Table 1420.02.6
Table 1420.02.2 - COMMERCIAL | |||
Commercial Structure and Use Permit Fees a,b,f | |||
NEW a | ADDITIONS a | ALTERATIONS c | |
Building Permit | GA x SFCT x 0.010 = PF | GA x SFCT x 0.010= PF | Value Range Table |
Electrical Permit | 12% x PF | 12% x PF | 12% x PF |
HVAC Permit | 12% x PF | 12% x PF | 12% x PF |
Plumbing Permit | 12% x PF | 12% x PF | 12% x PF |
3% State Fee | Plus 3% of all the fees above b | Plus 3% of all the fees above b | Plus 3% of all the fees above b |
Building Plan Review Fee | 12% x PF, $250.00 minimum | 12% x PF, $250.00 minimum | 12% x PF, $250.00 minimum |
Engineering TOPO Review Fees | 12% x PF, $250.00 minimum | 12% x PF, $250.00 minimum | N/A |
Engineering Inspection Fees | 12% x PF | 12% x PF | N/A |
Grading Compliance Deposit | $800.00 | $800.00 | N/A |
Sewer Cap Fee | Sewer Cap Range Table f | Sewer Cap Range Table f | N/A |
Tree Planting Fee | Tree Planting Range Table d | Tree Planting Range Table d | N/A |
Tree Deposit Fee | $500.00 | $500.00 | N/A |
Right of Way Deposit | $1000.00 | N/A | N/A |
Excessive Loads Fee | $100.00 | $100.00 | N/A |
Compliance Deposit | $2000.00 | $2,000.00 | $2,000.00 |
Certificate of Occupancy/Completion | $100.00 | $100.00 | $100.00 |
Total permit fees | Total permit fees | Total permit fees | |
Commercial Miscellaneous Permit Fees b,c,e,f,g | ||
Electrical Permit | Value Range Table c plus 3% State Fee b | |
HVAC Permit | Value Range Table c plus 3% State Fee b | |
Plumbing Permit | Value Range Table c plus 3% State Fee b | |
Demolition Building | $100.00 Flat Fee - Building Fee, $100.00 Review Fee | $200.00 Flat Fee - Engineering |
Demolition Interior | $200.00 Flat Fee - Building Fee, $100.00 Review Fee | |
Fire Suppression | Value Range Table c b Review Fee - 12% of Permit Fee, $150.00 minimum | |
Fire Alarm/Hood | Value Range Table c b Review Fee - 12% of Permit Fee, $150.00 minimum | |
Sign Permit | $50.00 Flat Fee b | Electrical $50.00 Flat Fee plus 3% Fee Tax b |
Deck | Value Range Table c | Includes building and topographical review |
In-ground Pool | $250.00 Flat Fee | Includes building, electrical, topographical review and gas if applicable |
Miscellaneous | Value Range Table c | |
Driveway/Apron | Value Range Table c | Includes building, engineering and topographical review |
Sidewalk | Value Range Table c | Includes building, engineering and topographical review |
Reroof | Re-Roof Range Table g | |
Sewer | $50.00 Flat Fee | |
Waterproofing | $100.00 Flat Fee | |
Water Control | $50.00 Flat Fee | |
Fence | Value Range Table c (x 50%) = PF | |
a. Building Valuation Data or “BVD” published by the International Code Council utilizes the “average construction costs per square foot table” and is one of the factors used for determining permit cost in the City of Strongsville. The average construction cost per square foot table presents factors that reflect relative value of one construction classification/occupancy group to another so that more expensive construction is assessed greater permit fees than less expensive construction.
b. A 3% fee is added to the building, electrical, mechanical and plumbing permits that are governed by the Ohio Building Code, pursuant to H.B. 175 and sections 103.2.4.2 and 103.2.4.1 of Rule 4101:8-1-03 of the Ohio Administrative Code adopted by the Board of Building Standards.
c. Refer to the Building Value Range Table 1420.02.3 for appropriate permit fees.
d. Refer to the Tree Planting Fund Range Table 1420.02.5 for appropriate permit fees.
e. Recreation capital improvement fee as determined by Strongsville C.O. 1224.06 and Planning Commission Approval.
f. Sewer Capitalization Rate Range Table 1420.02.6.
g. Refer to Commercial Re-roof Range Table 1420.02.4 for appropriate fees.
Building Permit Value Range Table 1420.02.3 |
Valuation Range |
From - To Base Fee Plus This Additional Rate Permit Fees |
$00.00 - $500.00 $50.00 + $0 = $50.00 |
$500.01 - $2,000.00 $50.00 + $3.00 per $100.00 = Permit Fee |
$2,000.01 - $25,000.00 $95.00 + $15.00 per $1000.00 = Permit Fee |
$25,001.00 - $50,000.00 $440.00 + $10.00 per $1000.00 = Permit Fee |
$50,000.00 - $100,000.00 $690.00 + $7.00 per $1000.00 = Permit Fee |
$100,001.00 - $500,000.00 $1040.00 + $6.00 per $1000.00 = Permit Fee |
$500,001.00 - $1,000,000.00 $3440.00 + $5.00 per $1000.00 = Permit Fee |
$1,000,001.00 - $1,000,000,000.00 $5940.00 + $4.00 per $1000.00 = Permit Fee |
Commercial Re-Roof Range Table 1420.02.4 |
Square Feet Of Roof Coverage |
From - To Base Fee Plus This Additional Rate Permit Fee |
0-Sq. Ft. - 5000-Sq. Ft. $50.00 + $0 = $50.00 |
5001 Sq. Ft. - 10,000,000 Sq. Ft. $100.00 +$50.00 per 5000.00 Sq.Ft. = Permit Fee |
(Ord. 2021-122. Passed 9-7-21.)
Tree Planting Fund Range Table 1420.02.5 |
Ground Surface Area Displaced By a New Building or Structure |
From - To Base Fee Plus This Additional Rate Permit Fee |
0-Sq.Ft. - 400 Sq. Ft. $0 + $0 = $0 |
400.01 Sq. Ft. - 2000 Sq. Ft. $450.00 + $0 = $450.00 |
2000.01 Sq. Ft. - 4000 Sq. Ft. $450.00 + $0 = $900.00 |
4000.01 Sq. Ft. - 10,000,000 Sq. Ft. $900.00 + $450.00 per 2000 Sq. Ft. = Permit Fee in excess of 4000 Sq. Ft. or portion thereof |
(Ord. 2022-045. Passed 3-21-22.)
Sewer Capitalization Rate Range Table 1420.02.6 | |
Size of Water Line (in inches) | Sewer Tap Fee |
0 - 1.0 | $2,013.00 |
1.5 | $10,066.00 |
2.0 | $16,106.00 |
3.0 | $32,212.00 |
4.0 | $50,330.00 |
6.0 | $100,661.00 |
8.0 | $161,058.00 |
10.0 | $231,520.00 |
(Ord. 2021-122. Passed 9-7-21.)