711.3 Offsets below lowest branch.
Where a vertical offset occurs in a soil or waste stack below the lowest horizontal branch, a change in diameter of the stack because of the offset shall not be required. If a horizontal offset occurs in a soil or waste stack below the lowest horizontal branch, the required diameter of the offset and the stack below it shall be determined as for a building drain in accordance with Table 710.1(1).
712.1 Building subdrains.
Building subdrains that cannot be discharged to the sewer by gravity flow shall be discharged into a gas-tight covered and vented ejector pit/basin from which the liquid shall be lifted and discharged into the building gravity drainage system by automatic pumping equipment or other approved method.
712.2 Valves required.
A check valve and a full open valve located on the discharge side of the check valve shall be installed in the pump or ejector discharge piping between the pump or ejector and the gravity drainage system. Access shall be provided to such valves. Such valves shall be located above the sump cover required by Section 712.1 or, where the discharge pipe from the ejector is below grade, the valves shall be accessibly located outside the sump below grade in an access pit with a removable access cover.
712.3 Ejector design.
The ejector pit and discharge piping shall conform to the requirements of Sections 712.3.1 through 712.3.5.
712.3.1 Ejector pump.
The ejector pump capacity and head shall be appropriate to anticipated use requirements.