Loading...
The provisions of this chapter shall not apply to any operation that is incident to the legitimate use of the premises. However, when such operation involves the commercial disposal of the material removed, such operation shall be limited to a maximum period of six (6) months. (1999 Code)
The provisions of this chapter shall not apply to the removal of topsoil, providing the operation is not closer than ten feet (10') to any property line or to a depth in excess of eighteen inches (18"), or such as to adversely affect the drainage of the area. (1999 Code)
Excavation operations shall not begin before seven o'clock (7:00) A.M. and shall not continue after the hour of six o'clock (6:00) P.M., and no operation shall take place on Sunday or legal holidays. During periods of national or unusual emergency, time and hours of operation may be altered at the discretion of the mayor. (1999 Code)
Loading...