19.46.030   Manufacturing/industrial zone land uses and permit requirements.
   The requirements in Table 4-9 shall apply to new land uses and structures, and alterations to existing land uses and structures, in addition to any applicable development standards (such as landscaping, parking and loading) in Division V of this title.
(Ord. 2185, Ord. 2427 §26, Ord. 2494 §27)
TABLE 4-9
MANUFACTURING/INDUSTRIAL ZONE GENERAL DEVELOPMENT STANDARDS
Development Feature
Requirement by Zoning District
ML
MG
IOMU
Development Feature
Requirement by Zoning District
ML
MG
IOMU
Minimum Lot Area
As necessary to comply with all applicable requirements of these Regulations.
Setbacks Required
   Front
None required, except where the parcel abuts an R zoning district, the same front setback shall be required as in the R district.
   Sides (each),
   Street side
20 ft. where the side of the parcel abuts an R district; none elsewhere. (1)
   Rear
20 ft. where the rear of the parcel abuts an R district; none elsewhere. (1)
Landscaping
See Section 19.68.040 (Landscape installation requirements.)
Site Coverage, Maximum
95%
75%
Height Limits
57 ft. Lesser height may be required through the Design Review process where the parcel abuts an R district.
57 ft. Lesser height may be required through the Design Review process where the parcel abuts an R district.
 
Notes:
(1)   A minimum 6-foot landscape buffer shall be included along the rear or side property line abutting the residential use.