Sections:
Article 1: Legal Authority
6-19.101 Legal authority.
Article 2: Purposes
6-19.201 Purposes.
Article 3: Applicability
6-19.301 Applicability.
Article 4: Definitions
6-19.401 Alternative system.
6-19.402 Appeal.
6-19.403 Appeal Board.
6-19.404 Applicant.
6-19.405 As-built drawing.
6-19.406 Authorized representative.
6-19.407 Bedroom or potential sleeping room.
6-19.408 Beneficial use.
6-19.409 Building permit.
6-19.410 Cesspool.
6-19.411 Cluster system.
6-19.412 Community system.
6-19.413 Contamination.
6-19.414 Contractor.
6-19.415 Cumulative impacts.
6-19.416 DEH.
6-19.417 Director of Environmental Health.
6-19.418 Dispersal field.
6-19.419 Dispersal system.
6-19.420 Division of Environmental Health (DEH).
6-19.421 Domestic wastewater.
6-19.422 Effective soil.
6-19.423 Effluent.
6-19.424 Expansion.
6-19.425 Failing system.
6-19.426 Final approval.
6-19.427 Geotechnical report.
6-19.428 Graywater.
6-19.429 Graywater system.
6-19.430 Groundwater.
6-19.431 High strength wastewater.
6-19.432 Holding tank.
6-19.433 Industrial wastewater.
6-19.434 Installation permit.
6-19.435 Land use project.
6-19.436 Large system.
6-19.437 Lot.
6-19.438 Manual.
6-19.439 Minimum useable wastewater dispersal area (MUWDA).
6-19.440 Non-discharging wastewater disposal unit.
6-19.441 Onsite wastewater treatment system (System).
6-19.442 Onsite Wastewater Treatment System Manual (Manual).
6-19.443 Onsite Wastewater Treatment System Policy (OWTS Policy).
6-19.444 Operating permit.
6-19.445 Operation, Maintenance and Monitoring (OM&M) Program.
6-19.446 Owner.
6-19.447 Percolation test.
6-19.448 Person.
6-19.449 Portable toilet.
6-19.450 Public nuisance.
6-19.451 Public sewer system.
6-19.452 Public water system.
6-19.453 Qualified system designer.
6-19.454 Qualified professional.
6-19.455 Regional Water Quality Control Board.
6-19.456 Replacement area.
6-19.457 Seepage pit.
6-19.458 Septage.
6-19.459 Septage pumper.
6-19.460 Septic tank.
6-19.461 Service provider.
6-19.462 Site evaluation.
6-19.463 Site evaluation report.
6-19.464 Site map review.
6-19.465 Slope.
6-19.466 Soil.
6-19.467 Soil texture.
6-19.468 Standard system.
6-19.469 Subdivision.
6-19.470 Substandard tank.
6-19.471 Supplemental treatment.
6-19.472 Supplemental treatment unit.
6-19.473 System.
6-19.474 System design.
6-19.475 Unstable land mass.
6-19.476 Vault privy.
6-19.477 Vertical separation.
6-19.478 Wastewater.
6-19.479 Watercourse.
6-19.480 Waterless toilet.
Article 5: Onsite Wastewater Treatment System Manual
6-19.501 Manual.
6-19.502 Wastewater application rates and septic tank size.
Article 6: General Requirements
6-19.601 General requirements.
6-19.602 System subjected to California Central Valley Regional Water Quality Control Board waste discharge requirements.
6-19.603 Requirements for system contractor.
6-19.604 Permits.
6-19.605 Requirements for site evaluation.
6-19.606 Requirements for siting, design, operation and maintenance.
6-19.607 Approved sewage disposal required.
6-19.608 General requirements for building permit application using existing system.
6-19.609 General requirements for business license application using existing system.
6-19.610 Prohibitions.
6-19.611 Minimum horizontal setbacks.
6-19.612 Minimum vertical setbacks.
6-19.613 Construction inspections.
6-19.614 Unauthorized work.
6-19.615 Abatement.
6-19.616 Required notification of system failure.
6-19.617 Required notification of a system installation.
6-19.618 Abandoned system.
6-19.619 Refusal to finalize building permit for occupancy.
6-19.620 Cesspools; seepage pits, and substandard tanks.
6-19.621 Holding tanks; portable toilets; vault privy.
6-19.622 Cumulative impacts.
6-19.623 Property improvements and system expansion.
6-19.624 Replacement of the dispersal field.
Article 7: Alternative System Requirements
6-19.701 Use of alternative systems.
6-19.702 Installation permit and review requirements for alternative systems.
6-19.703 Operation, maintenance and monitoring (OM&M) requirements.
Article 8: Non-Discharging Wastewater Disposal
Article 9: Graywater Systems
6-19.901 Graywater systems.
Article 10: Septage Pumping, Inspections and Reporting Requirements
6-19.1001 Permitting, inspection and reporting requirements.
Article 11: Land Use Project
6-19.1101 Land use project.
Article 12: Connection to Public Sewer System
6-19.1201 Connection to public sewer system required.
Article 13: Groundwater Protection
6-19.1301 Areas with potential for groundwater pollution.
6-19.1302 Areas with impacted groundwater.
Article 14: Reporting to Central Valley Regional Water Quality Control Board
6-19.1401 Report requirements.
6-19.1402 Records retention.
6-19.1403 Water Quality Assessment Program.
Article 15: Enforcement and Penalties
6-19.1501 Enforcement.
6-19.1502 Right of entry.
6-19.1503 Notice of violation.
6-19.1504 Cease and desist orders.
6-19.1505 Penalties.
Article 16: Appeals
6-19.1601 Appeals procedure.
Article 17: Severability
6-19.1701 Severability.