(a) The applicant shall grant DEH access to the property for purposes of inspecting a system in accordance with the requirements of this chapter, the Manual, and/or with any conditions specified on the installation permit or operating permit.
(b) A stamped copy of the approved system installation permit must be kept available at the jobsite during the system installation and until the system passes final inspection.
(c) In the case of an owner installed system, additional inspections may be required to assure proper installation of the system.
(d) In the case of a system subject to an operating permit, the service provider may be required to attend the final inspection.
(Ord. 1469, eff. July 14, 2016)