Sec. 6-19.617.   Required notification of a system installation.
   DEH shall provide a copy of the system permit application to the owner of a public water system if the proposed system is one (1) of the following:
   (a)   The proposed system installation is within one thousand two hundred (1,200) feet of an intake point for a surface water treatment plant for drinking water; or
   (b)   The proposed system is in the drainage catchment in which the intake point is located; or
   (c)   The proposed system location is such that it may impact water quality at the intake point such as being upstream of the intake point for a flowing water body.
   If the owner of the public water system cannot be identified, DEH will notify Division of Drinking Water of the State Water Resources Control Board.
   The public water system shall have fifteen (15) days from receipt of the permit application to provide recommendations and comments to the DEH regarding the proposed system.
(Ord. 1469, eff. July 14, 2016)