B. Where possible, existing poles shall be used to provide the required transition to underground service to new
to scenic corridors. However, a new pole set in line with the existing overhead system when necessary to serve approved new
is not deemed to be a new utility. Upgrades and reinforcements of existing overhead facilities is allowed to the extent that the total number of electrical circuits or communication cables is not increased. Relocation of overhead utility facilities required by public improvement districts along scenic corridors shall conform with existing franchise standards.
C. When an existing
is expanded by 50% or more in
or land area, new and existing
to all portions of the
shall be located underground unless relief is otherwise granted pursuant to UDC sections 5.3.14, Variances and/or through a Zoning Examiner special exception process per Section 4.9.11.A.12. Incremental expansion shall be cumulative. Additions to single-
dwellings are exempt from this standard.
(Am. Ord. 11942, 7/12/2022)
A.
or surfaces, that are
, shall have colors that are predominant within the surrounding landscape, such as desert and earth tones. Single-
dwellings, except in
recorded after May 28, 1985, are exempt from this standard.
B. Fencing and freestanding walls facing the
shall meet the material restrictions in Section 7.6.5, Screening Standards.
C. Signs are required to comply with the following:
2. Signs shall use colors that are predominant within the surrounding landscape, such as desert and earth tones;
3. No commercial advertising sign, except a sign pertaining to a use conducted on the premises or a sign advertising the sale or lease of the property upon which the sign is located, and no billboard shall be erected within 400 feet of the
line on any
; and,
4. When the standards of this section and Section 3-32 conflict, the more restrictive of the two prevails.
(Am. Ord. 11803, 12/8/2020)
A. Applications for
within the SCZ are reviewed and considered for approval in accordance with Section 3.3.3, PDSD
Approval Procedure.
B. At the request of the PDSD
or applicant, the Design Review Board (DRB) shall review
elevations,
,
, and other contributing design features to substantiate compliance with the standards required in making a decision.
C. The decision to approve or deny the
shall be based on the purpose, intent, and specific standards of this section, on the objectives specified in the
for scenic corridor
, and on the following standards that provide for the preservation of:
1. Views of prominent mountain
that form the limits of scenic viewsheds and provide a natural backdrop for sensitively designed
;
2. Viewsheds that provide the observer with a visual perspective of the area in terms of foreground, middle ground, and background;
3. The scenic quality of the desert and mountain environment through the retention of
and natural topography; and,
4. View windows through an aesthetic screening or siting of developmental elements that are incompatible with the natural qualities of the surrounding area.
cannot occur until 30
prior to
construction. For commencement of
, the
construction plans shall be, at minimum, in the review process for permits, or the
construction permits shall have already been ready to be issued.
permits shall cover only those areas for which base plans have been approved.
Designation, amendment, or change of boundaries for a Scenic Corridor
are processed in accordance with Section 5.4.3, MS&R Map Adoption and Amendment.