Skip to code content (skip section selection)
Compare to:
Toledo Overview
Toledo Municipal Code
TOLEDO MUNICIPAL CODE
CERTIFICATION
ADOPTING ORDINANCE
EDITOR'S NOTE
COMPARATIVE SECTION TABLE
CHARTER OF THE CITY OF TOLEDO, OHIO
PART ONE - ADMINISTRATIVE CODE
PART THREE - TRAFFIC CODE
PART FIVE - GENERAL OFFENSES CODE
PART SEVEN - BUSINESS REGULATION CODE
PART NINE - STREETS, UTILITIES AND PUBLIC SERVICES CODE
TITLE ONE - Streets, Sidewalks and Public Grounds
TITLE THREE - Utilities
CHAPTER 925 Sewer Definitions and Construction Standards
CHAPTER 927 Sewer Connections and Use
CHAPTER 929 Sewer Service Charges
CHAPTER 930 Sewer Discharge Control
CHAPTER 931 Special Sewer Provisions and Payments
CHAPTER 932 Roadside Drainage Systems
CHAPTER 933 Water Rates
CHAPTER 935 Nonresident Water Service
CHAPTER 937 Water Meters
CHAPTER 939 Water Regulations
CHAPTER 941 Storm Water Discharge Control
CHAPTER 943 Storm Water Management Program
CHAPTER 945 Management and Control of the Public Right of Way
CHAPTER 947 Provision of Electric Energy
CHAPTER 949 Toledo Public Power
APPENDIX A
APPENDIX B
APPENDIX C
APPLICABILITY
DEFINITIONS
CHAPTER 100 GENERAL ADMINISTRATION
CHAPTER 101 APPLICATION FOR UTILITY SERVICES
CHAPTER 102 CUSTOMER OBLIGATIONS
CHAPTER 103 SERVICE DISCONNECTIONS
CHAPTER 104 BILLING
CHAPTER 105 APPEAL PROCESS
CHAPTER 106 COLLECTIONS
CHAPTER 107 DEPARTMENT ACTIONS
CHAPTER 108 TYPES OF ACCOUNTS
CHAPTER 200 WATER SERVICES (TAPS AND CUSTOMER BRANCHES)
CHAPTER 201 METERS
CHAPTER 202 FIRE PROTECTION SERVICES
CHAPTER 203 PUBLIC HYDRANTS
CHAPTER 204 CROSS CONNECTIONS
CHAPTER 205 WATER SERVICE MAIN EXTENSIONS
CHAPTER 206 REGULATIONS FOR CONTRACTORS
CHAPTER 207 RIGHTS OF ENTRY
CHAPTER 300 WASTEWATER HAULING REGULATIONS
CHAPTER 400 STORM AND SANITARY SEWERS
CHAPTER 401 PLATS
CHAPTER 402 SIDEWALK POLICY OF THE CITY OF TOLEDO
CHAPTER 403 STORM WATER ERU APPEAL
CHAPTER 404 RIGHT-OF-WAY OCCUPANCY PERMIT APPEALS
CHAPTER 405 RIGHT-OF-ENTRY ON PRIVATE PROPERTY
CHAPTER 500 (Reserved)
CHAPTER 600 SEWER DISCHARGE CONTROL APPEAL
CHAPTER 601 STORM WATER DISCHARGE APPEAL
ATTACHMENT 1 FEE SHEET OF THE DIRECTOR OF PUBLIC UTILITIES
ATTACHMENT 2 JUDGMENT ENTRY (BY CONSENT) McDOWELL v. TOLEDO
APPENDIX D
TITLE FIVE - Other Public Services.
PART ELEVEN - PLANNING AND ZONING CODE
PART TWELVE - DEVELOPMENT CODE
PART THIRTEEN - BUILDING CODE
PART FIFTEEN - FIRE PREVENTION CODE
PART SEVENTEEN - HEALTH CODE
PART NINETEEN - TAXATION CODE
PART TWENTY-ONE - PERSONNEL RELATIONS AND MUNICIPAL EMPLOYMENT
Loading...
201.18 Additional Meter - Permit Fee
   A permit fee for each additional meter to commercial and industrial accounts may be charged at the discretion of the Department. This fee must be paid at the time of application for any additional water metering.
201.19 Inspection Fee and Billing Charge
   An annual inspection/billing fee may be charged for the second water meter or a sewer meter. This fee may be included in the Customer's first bill of each year.
201.20 Sewage Metering For Water Not Supplied By City
   If the user discharges water not supplied by the City to the City sewer system, the metering shall be in accordance with TMC § 929.06.
201.21 Installation Procedures
   Based on the metering method used, the following criteria shall be met:
   A.   Water Meter Only - Shall meet requirements of Chapter 201 of these Rules and Regulations.
   B.   Two Water Meters - Shall meet requirements of Chapter 201 of these Rules and Regulations and TMC § 929.07 and the following:
      1.   The second water meter shall be installed in the same location as the primary water meter unless otherwise approved by the Department, in which case a remote register or radio transmitter must be placed near the primary meter.
      2.   The Division of Water Distribution must approve all plans for all piping connections involving a second water meter.
      3.   The user shall guarantee, in writing, to the Director, that no change or alterations will be made in the metering procedure as approved by the Department.
      4.   The user shall allow inspection by the City of the piping system and meter installation during construction, and periodically thereafter, to ensure proper connections and usage.
   C.   Water Meter Plus Sewage Meter: shall meet the requirements of this Chapter 201 of these Rules and Regulations and TMC § 929.07 and the following:
      1.   The sewage meter shall measure all user discharge that enters the City sewer system.
      2.   The sewage meter shall be installed in a location approved by the Department so that convenient and safe access is available for reading and inspection.
      3.   The Division of Water Reclamation must approve all plans for piping connections involving a sewage meter.
      4.   The user shall guarantee, in writing, to the Director that the sewage meter will be properly maintained to accurately measure the discharge.
      5.   The user shall allow inspection by the City of the piping system and meter installation during construction, and periodically thereafter, to ensure proper connections and usage.
201.22 Inquiries
   Questions pertaining to sewage metering should be directed to the Division of Water Reclamation. Questions pertaining to water metering shall be directed to the Division of Water Distribution. Industrial discharge billing questions should be directed to the Division of Utilities Administration, monthly billing section.
201.23 Metering: Industrial Discharge For Commercial And Industrial Accounts
   All requests for alternate metering methods for discharge systems are to be presented to the Division of Water Distribution. Only commercial and industrial accounts are subject to this policy. To be eligible for this type of account, the Customer will be required to switch the account to monthly billing.
201.24 Sewer Metering: Purpose
   Sewer Metering is used to measure all flow into the sewage system separate from the incoming water meter(s). Information on alternate metering methods and approval is available in these Rules and Regulations.
201.25 Sewer Metering: Installation
   All new sewer meter installations used for alternate metering must meet, without limitation, the following criteria:
   A.   The sewage meter shall measure all user discharge that enters the City sewer system.
   B.   The Division of Water Reclamation must approve all plans for piping connections, meter type, and location, involving a sewage meter. The sewage meter shall be installed to allow convenient access for reading and inspection.
   C.   The sewage meter must be supplied with a non-resetable totalizer. The totalizer must maintain the reading during power failures. If the reading is resetable in any way or method, then the totalizer must be placed in an enclosure that can be protected by a security seal(s). The enclosure must have a viewing window to allow reading. The Owner must provide the maximum number of digits the totalizer can display, and what units it is reading (Cubic Feet is preferred).
   D.   The user shall guarantee, in writing, to the Director that the sewage meter will be properly maintained to accurately measure the discharge.
   E.   The user shall allow inspection by the City of the piping system and meter installation during construction, and periodically thereafter, to ensure proper connections and usage.
201.26 Metering: Calibration
   A.   Sewage meters must be calibrated by an approved contractor or factory representative at regular intervals determined by the Division of Water Reclamation. The Division of Water Reclamation personnel shall be allowed the opportunity to witness the calibration procedure. In addition, a written calibration report must be submitted within thirty (30) days of the procedure. Expenses associated with calibrations are the sole responsibility of the Owner.
   B.   It has been demonstrated that inline magnetic flow meters are more accurate and allow longer periods between calibrations. Inline magnetic flow meters shall be calibrated at a period not to exceed three (3) years. All other types of sewage meters shall be calibrated annually.
   C.   If the Director has reason to believe that a sewage meter used for alternate billing purposes is sufficiently in error, a certified calibration may be required at the Owner's expense.
   D.   Failure to comply within sixty (60) days of being notified in writing of the required calibration may result in sewage usage being calculated on 100% of the incoming water to the Premises back to the last known calibration date.
Loading...