Preliminary subdivision plans must have all elements within Table 1 included in the application before a staff review is completed. The planning commission in its recommendation and the city council in its approval shall take into consideration all elements and approval criteria in Table 1.
Table 1 Element and Approval Criteria for Preliminary Plans
| |
Elements | Approval Criteria |
Table 1 Element and Approval Criteria for Preliminary Plans
| |
Elements | Approval Criteria |
The owner, developer, and engineer’s names, addresses, and telephone numbers | Use as contact for the project for comments and notifications. |
Submitted by licensed engineer | The earmark that distinguishes a licensed/registered professional engineer is the authority to sign and seal or “stamp” engineering documents for a design or analysis, thus taking legal responsibility for it. |
Proposed name of subdivision | The name shall not duplicate, be the same in spelling, or alike in pronunciation with the name of any other recorded subdivision, unless it is an extension of or adjoining to an existing subdivision. |
The names of all adjoining subdivisions with adjoining unplatted property shall be labeled as such | Showing connectivity with lot and block lines, easements, and rights-of-way. |
Lot and block layout | |
Vicinity map to scale showing location of preliminary subdivision plan | Includes other property between 660-1,320' in every direction. |
Proposed zoning districts | Sufficient to allow for staff review of residential densities and nonresidential structure size. |
Area, legal description and notations stating acreage, scale, and north arrow | Determine if plan boundaries meet stated ownership; adjacent property notification, if required; measurement and review of plans. |
The location of existing blocks, lots, building lines, water courses, drainageways, bridges, culverts, wells, cell towers, septic systems, on-site wastewater systems, present structures, any fixtures, and any pertinent natural features in the area affected, with principal dimensions and all significant information in regard to property, immediately adjacent on all sides | Will not place any existing lot or building in violation of any applicable ordinance, code, regulation, law including, but not limited to, zoning, building, subdivision, and flood prevention and comply with the parks/open space needs identified within the growth management plan and §§ 157.190 and 157.191. |
Existing contours referenced to city datum with intervals sufficient to determine the character and topography of the land to be subdivided | Utility coordination and comply with water, sewer, grading/drainage plans. |
Boundary lines of floodways and 100-year flood zones delineated on the Flood Insurance Rate Maps (FIRM) | To ensure buildable lots. |
Phasing and timelines | Per annexation resolution and for purposes of identifying final utility plan parcels (based on watershed boundaries); construction planning for private and public entities. |
Proposed city reimbursements | Coordination with CIP and city disbursements. |
Other data consistent with or required within the developers/preannexation agreement | Only data as required within an annexation, preannexation. |
Preliminary drainage plan | Comply with EDS Ch. 13.2.2 |
Preliminary sanitary sewer plan | Comply with EDS Ch. 13.2.2 |
Preliminary street lighting plan | Comply with EDS Ch. 13.2.2 |
Preliminary street plan | Comply with EDS Ch. 13.2.2 |
Preliminary water plan | Comply with EDS Ch. 13.2.2 |
(1992 Code, App. A, § 15A.04.020) (Ord. 81-08, passed 7-7-2008; Ord. 94-16, passed 8-2-2016; Ord. 87-18, passed 10-2-2018)
(a) Any preliminary subdivision plan which has not received development engineering plan approval for all or a portion of the preliminary subdivision plan area within a period of three years would require resubmittal of a new plan for approval subject to any new subdivision regulations unless a waiver from the city director of planning and development services is approved.
(b) Upon written request to the city director of planning and development services and prior to the preliminary plan expiration date, a one-year time extension for the preliminary plan may be granted by the city’s director of planning and development services, subject to the following condition that the land uses for land within the preliminary subdivision plan area have not significantly been altered since the original approval date for the preliminary subdivision plan.
(1992 Code, App. A, § 15A.04.030) (Ord. 81-08, passed 7-7-2008; Ord. 87-18, passed 10-2-2018)
(a) (1) Amendments to an approved preliminary subdivision plan may be requested by the developer.
(2) The city engineer and city director of planning and development services may request an updated preliminary subdivision plan for review and approval when changes to the plan are proposed.
(b) Amendments to a preliminary plan shall consist of external impacts, including changes in major (collectors) street pattern, change of zones, drainage facility location, other public open space location or perimeter boundaries.
(1) Amendments to an approved preliminary subdivision plan shall follow the procedures for approval of a preliminary subdivision plan as required in this section.
(2) The approved plan, and any amendments, shall be kept on file with the city engineer and planning director.
(1992 Code, App. A, § 15A.04.040) (Ord. 81-08, passed 7-7-2008; Ord. 87-18, passed 10-2-2018)
DEVELOPMENT ENGINEERING PLANS
(a) The development engineering plan is a process designed to assist the developer and the city with the efficient and timely development of utilities and final lot and block layout to and throughout a development. Plans will be evaluated for compliance with the Engineering Design Standards and the capital improvement program. The development engineering plan approval will be based upon the engineering feasibility of the development including the determination of more precise locations of all lots, blocks, and streets.
(b) Following the approval of the preliminary subdivision plan, if the developer wishes to proceed, an electronic copy of the development engineering plans shall be submitted to the online plan review at the city of Sioux Falls website for review and acceptance by the city engineering office. The development engineering plans shall encompass all land included in a phase as shown on the preliminary subdivision plan, be in compliance with conditions and approval criteria of the preliminary subdivision plan and existing and proposed easements shown and dimensioned from property lines and utilities.
(c) The development engineering plans shall comply with the respective chapters within the adopted Engineering Design Standards and with criteria within this chapter. All development utility plans shall be approved or disapproved within 15 working days after submittal to the city engineer. In addition, a development lot and block layout shall be approved by the city engineer. All development engineering plans are required to have all elements and approval criteria listed in Table 2. If these plans are approved, the developer may then submit the plat(s) and subdivision construction agreement(s) for approval.
Table 2 Development Engineering Plan Element and Approval Criteria | |
Elements | Criteria |
Table 2 Development Engineering Plan Element and Approval Criteria | |
Elements | Criteria |
Lots and blocks including a systematic lot and block numbering pattern, lot lines and zoning districts | |
Location and widths of all existing and proposed easements | Utility coordination; consistent with § 157.117 and EDS |
Location of all street right-of-way including width and street names | |
The location of existing blocks, lots, building lines, water courses, drainageways, bridges, culverts, wells, septic systems or other on-site wastewater systems, cell towers, septic systems or other present structures, and any pertinent natural features in the area affected, with principal dimensions and all significant information in regard to property, immediately adjacent on all sides | Will not place any existing lot or building in violation of any applicable ordinance, code, regulation, law including, but not limited to, zoning, building, subdivision, and flood prevention and consistent with the needs identified within Chapter VII and IX of the growth management plan and §§ 157.190 and 157.191 |
Boundary lines of floodways and 100-year flood zones delineated on the Flood Insurance Rate Maps (FIRM) | To ensure buildable lots |
Drainage Development Utility Plans | § 157.160 et al and EDS 13.2.3 |
Grading Development Utility Plans | EDS Chapter 7 |
Water Development Utility Plans | § 157.130 et al and EDS 13.2.3 |
Sanitary Sewer Development Utility Plans | § 157.145 et al and EDS 13.2.3 |
Erosion and Sediment Control Development Utility Plans | § 157.175 et al and EDS 13.2.3 |
(d) Amendments to development engineering plan lot and block layout.
(1) The city engineer and city director of planning and development services may request an updated development engineering plan for review and approval when changes to the plan are proposed or when a proposed plat is not consistent with the development engineering plan. The proposed amendment may include the submission of an updated preliminary subdivision plan to the planning office.
(2) Amendments shall be done administratively with signed approval by the city director of planning and development services and city engineer and coincide with the development engineering plans.
(1992 Code, App. A, § 15A.05.010) (Ord. 81-08, passed 7-7-2008; Ord. 11-09, passed 1-12-2009; Ord. 87-18, passed 10-2-2018)
THE PLAT
Platting is a process designed to assist the developer and the city to approve the appropriate features of a proposed subdivision and place them on file with the county register of deeds. Platting is required when land is divided into tracts for purpose of sale, transfer of ownership or in creating a new building site prior to issuance of a building permit, or connecting to city utilities.
(1992 Code, App. A, § 15A.05.020) (Ord. 81-08, passed 7-7-2008)