§ 96.053 APPROVAL AND INSPECTION.
   (a)   An inspection shall be made after the installation of any sidewalk or driveway approach in the public right-of-way. Inspection requests shall be made within two business days of completion of the work. If an inspection request is not made, an administrative citation may be issued.
   (b)   The construction of sidewalks and driveway approaches within the public right-of-way shall be approved by the city prior to the issuance of a certificate of occupancy as provided by the building code, except where conditions exist which in the opinion of the city engineer or the city engineer's designee justify waiver.
(1992 Code, § 38-41) (Ord. 104-99, passed 10-14-1999; Ord. 28-17, passed 3-21-2017)