ARTICLE 5: CONSTRUCTION IN OR NEAR STREET
Section
   20-5-1   Excavations; permit; required
   20-5-2   Application; contents
   20-5-3   Same; investigation; bond
   20-5-4   Permit; exhibiting
   20-5-5   Public safety requirements; workers; knowledge
   20-5-6   Frozen ground; freezing temperature; restrictions
   20-5-7   Barricades; lighting
   20-5-8   Obstruction of sidewalk; walkway around
   20-5-9   Leftover materials; removal; by holder of permit
   20-5-10   Backfilling; by holder of permit
   20-5-11   Removal of leftover materials; backfilling; by city; expense; charge; collection
   20-5-12   Excavations; prospective paving; notice to persons affected; restrictions
   20-5-13   Cutting into paving, curb, sidewalk; permit; required
   20-5-14   Same; application; investigation
   20-5-15   Same; deposit; required; conditions
   20-5-16   Same; bond; required; conditions
   20-5-17   Same; work; manner; by whom done
   20-5-18   Reserved
   20-5-19   Curb cuts; requirements; restrictions
   20-5-20   Driveways; aprons; over curbs; corners; permit; bond; specifications
   20-5-21   Same; when streets curbed, guttered, and paved; owner; notice to; cost; assessment
   20-5-22   Buildings; other structures; prohibited; nuisance; exceptions
   20-5-23   Building materials; storage; permit; required; issued; when
   20-5-24   Hydrants; fountains; restrictions
   20-5-25   Repealed
   20-5-26   Repealed
   20-5-27   Repealed
   20-5-28   Traffic signs; exception
   20-5-29   Repealed
   20-5-30   Repealed
   20-5-31   Barbed wire fence; prohibited; removal
   20-5-32   Curb; buffer block; in alley; restrictions
   20-5-33   Unnecessary delay; prohibited; determination
   20-5-34   Violations; penalty