Section
20-5-1 Excavations; permit; required
20-5-2 Application; contents
20-5-3 Same; investigation; bond
20-5-4 Permit; exhibiting
20-5-5 Public safety requirements; workers; knowledge
20-5-6 Frozen ground; freezing temperature; restrictions
20-5-7 Barricades; lighting
20-5-8 Obstruction of sidewalk; walkway around
20-5-9 Leftover materials; removal; by holder of permit
20-5-10 Backfilling; by holder of permit
20-5-11 Removal of leftover materials; backfilling; by city; expense; charge; collection
20-5-12 Excavations; prospective paving; notice to persons affected; restrictions
20-5-13 Cutting into paving, curb, sidewalk; permit; required
20-5-14 Same; application; investigation
20-5-15 Same; deposit; required; conditions
20-5-16 Same; bond; required; conditions
20-5-17 Same; work; manner; by whom done
20-5-18 Reserved
20-5-19 Curb cuts; requirements; restrictions
20-5-20 Driveways; aprons; over curbs; corners; permit; bond; specifications
20-5-21 Same; when streets curbed, guttered, and paved; owner; notice to; cost; assessment
20-5-22 Buildings; other structures; prohibited; nuisance; exceptions
20-5-23 Building materials; storage; permit; required; issued; when
20-5-24 Hydrants; fountains; restrictions
20-5-25 Repealed
20-5-26 Repealed
20-5-27 Repealed
20-5-28 Traffic signs; exception
20-5-29 Repealed
20-5-30 Repealed
20-5-31 Barbed wire fence; prohibited; removal
20-5-32 Curb; buffer block; in alley; restrictions
20-5-33 Unnecessary delay; prohibited; determination
20-5-34 Violations; penalty