Sec. 9-209 Individual Wastewater Discharge Permit Modification.
   a.   The Superintendent may modify an individual wastewater discharge permit for good cause, including, but not limited to, the following:
      (1)   To incorporate any new or revised federal, state, or local pretreatment standards or requirements;
      (2)   To address significant alterations or additions to the user’s operation, processes, or wastewater volume or character since the time of the individual wastewater discharge permit issuance;
      (3)   A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge;
      (4)   Information indicating that the permitted discharge poses a threat to the Town’s POTW, Town personnel, or the receiving waters;
      (5)   Violation of any terms or conditions of the individual wastewater discharge permit;
      (6)   Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting;
      (7)   Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13;
      (8)   To correct typographical or other errors in the individual wastewater discharge permit; or
      (9)   To reflect a transfer of the facility ownership or operation to a new owner or operator.
   b.   The filing of a request by the permittee for a wastewater discharge permit modification does not stay any wastewater discharge permit condition.
(Ord. No. 1862, § 5.4, 2-11-15)