Sec. 7-23 Electrical and Mechanical Electrical Fees.
 
Type of Permit
Existing Fee
Proposed Fee
Flat fee (new construction or new service panel)
$50.00
(no change)
+ single phase per AMP
$.65
$.80
+ three phase current per AMP
$.65
$.80
Flat fee (remodel or addition)
$30.00
$50.00
Single phase current per AMP (sub-panel)
$.50
$1.10
 
 
Type of Permit
Existing Fee
Proposed Fee
+ three phase current per AMP (sub-panel)
$.50
$1.10
Extra Inspection fee
$25.00
$50.00
Re-inspection (Red Tag)
$25.00
$50.00
Temporary Pole
$25.00
$50.00
 
MECHANICAL
 
Type of Permit
Existing Fee
Proposed Fee
Flat fee (new construction only)
$30.00
$50.00
For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h, add
$15.00
$40.00
Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h, add
$20.00
$50.00
Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit, add
$4.50
$15.00
Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption or evaporative cooling system, including installation of controls regulated by this code, add
$15.00
$40.00
Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h, add
$15.00
$50.00
 
Type of Permit
Existing Fee
Proposed Fee
Type of Permit
Existing Fee
Proposed Fee
Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu/h and including 500,000 Btu/h, add
$20.00
$50.00
Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h, add
$30.00
$60.00
Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h, add
$60.00
$110.00
Installation or relocation of each boiler or refrigeration compressor over 50 horsepower or each absorption system over 1,750,000 Btu/h, add
$75.00
$140.00
Each air-handling unit over 10,000 cfm, add
$15.00
$50.00
Each evaporative cooler other than portable type, add
$9.00
$20.00
Each ventilation fan connected to a single duct, add
$5.00
$10.00
Each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit, add
$9.00
$20.00
Installation of each hood which is served by mechanical exhaust, including the ducts for such hood, add
$9.00
$100.00
 
 
Type of Permit
Existing Fee
Proposed Fee
Each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code, add
$9.00
$50.00
   For each gas-piping system of one to four outlets, add
$3.00
$6.00
   For each gas-piping system of five or more outlets, per outlet add
$.75
$2.00
 
(Ord. No. 1202, § 2, (3), 3-11-92; Ord. No. 1744, § 2, 11-12-08)