Type of Permit | Existing Fee | Proposed Fee |
Flat fee (new construction or new service panel) | $50.00 | (no change) |
+ single phase per AMP | $.65 | $.80 |
+ three phase current per AMP | $.65 | $.80 |
Flat fee (remodel or addition) | $30.00 | $50.00 |
Single phase current per AMP (sub-panel) | $.50 | $1.10 |
Type of Permit | Existing Fee | Proposed Fee |
+ three phase current per AMP (sub-panel) | $.50 | $1.10 |
Extra Inspection fee | $25.00 | $50.00 |
Re-inspection (Red Tag) | $25.00 | $50.00 |
Temporary Pole | $25.00 | $50.00 |
MECHANICAL
Type of Permit | Existing Fee | Proposed Fee |
Flat fee (new construction only) | $30.00 | $50.00 |
For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h, add | $15.00 | $40.00 |
Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h, add | $20.00 | $50.00 |
Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit, add | $4.50 | $15.00 |
Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption or evaporative cooling system, including installation of controls regulated by this code, add | $15.00 | $40.00 |
Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h, add | $15.00 | $50.00 |
Type of Permit | Existing Fee | Proposed Fee |
Type of Permit | Existing Fee | Proposed Fee |
Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu/h and including 500,000 Btu/h, add | $20.00 | $50.00 |
Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h, add | $30.00 | $60.00 |
Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h, add | $60.00 | $110.00 |
Installation or relocation of each boiler or refrigeration compressor over 50 horsepower or each absorption system over 1,750,000 Btu/h, add | $75.00 | $140.00 |
Each air-handling unit over 10,000 cfm, add | $15.00 | $50.00 |
Each evaporative cooler other than portable type, add | $9.00 | $20.00 |
Each ventilation fan connected to a single duct, add | $5.00 | $10.00 |
Each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit, add | $9.00 | $20.00 |
Installation of each hood which is served by mechanical exhaust, including the ducts for such hood, add | $9.00 | $100.00 |
Type of Permit | Existing Fee | Proposed Fee |
Each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code, add | $9.00 | $50.00 |
For each gas-piping system of one to four outlets, add | $3.00 | $6.00 |
For each gas-piping system of five or more outlets, per outlet add | $.75 | $2.00 |
(Ord. No. 1202, § 2, (3), 3-11-92; Ord. No. 1744, § 2, 11-12-08)