No persons shall occupy any structure prior to receiving the proper Occupancy Permits. All Occupancy Permits are subject to all Federal, State, and Local regulations (i.e. Building Codes); including, but not limited-to the following: Final lot grading in accordance with the subdivision engineering design elevations; proper gutter, downspout and drainage design; hard surface coat on driveway; completion of sidewalks and entrance walkways, if applicable; stairways and appropriate railings to all outside entrances, posting of address with three inch (3") contrasting numeral; etc.
(Ord. No. 1095, § VII-6, 12-14-88)