CHAPTER 54: WATER SUPPLY AND DISTRIBUTION
Section
   54.01   Definitions
   54.02   Where mains will be laid without assessments
   54.03   Laterals to be laid only to inside of curb
   54.04   Extension of laterals
   54.05   Connections to be made within 30 days after mains ready for use
   54.06   Connections to be made by town
   54.07   Connections to be made only upon application
   54.08   Application for connections
   54.09   Payment for connections
   54.10   Connection fees, monthly rates, and the like
   54.11   Approval of application
   54.12   Construction of connections
   54.13   Separate connections required
   54.14   Air chambers and meters for hydraulic elevators and motors
   54.14-5   Irrigation systems
   54.15   Connections and meters to remain property of town
   54.16   Maintenance of meters
   54.17   Maintenance of connections
   54.18   Connection to other than town water supply
   54.19   Connections from outside town
   54.20   Classes of services
   54.21   When water rents payable
   54.22   Returned checks
   54.23   Cutting on water after discontinuance
   54.24   Climbing water towers
   54.25   Tampering with water system
   54.26   Protection of water system
   54.27   More than one user on single meter
 
   54.99   Penalty