Section
Article 1. Basic Provisions
1.1 Title
1.2 Authority
1.3 Purpose
1.4 Effective date
1.5 Repealer
1.6 Severability
1.7 Exclusion
1.8 Interpretation
1.9 Jurisdiction
1.10 Findings
1.11 Private provisions
1.12 Saving provision
1.13 Transition rules for applications for primary plat approval, secondary plat approval or the vacation of plats or parts of plats
1.14 Amendments
1.15 Compliance
1.16 Definitions
1.17 Improvement location permits
1.18 Recording required for issuance of an improvement location permit
1.19 Incorporation by reference
1.20 Appeals
Article 2.1. General Procedures
2.1A Conceptual plat review
2.1B Filing for primary plat approval
2.1C Filing for secondary plat approval
2.1D Special provision for nonresidential incremental subdivisions
2.1E Recording and filing of recorded secondary plat
2.1F Special provisions for the amendment of a secondary plat
Article 2.2. Required Plans
2.2 Required plans
2.2A General
2.2B Sketch plans for conceptual plat review
2.2C Plans for primary plat approval of major residential subdivisions
2.2D Plans required for primary plat approval of minor residential subdivisions
2.2E Plans for primary plat approval of nonresidential subdivisions
2.2F Plans required for primary approval of nonresidential incremental subdivisions
2.2G Plans for secondary approval of subdivisions
2.2H Construction plans
2.2I Plans for amended secondary approval of subdivisions
Article 2.3. Completion and Maintenance of Improvements
2.3 Completion and maintenance of improvements
2.3A Completion of improvements, installations and lot improvements
2.3B Surety for improvements, installations and lot improvements
2.3C Proof of compliance
2.3D Completion letter
2.3E Maintenance bond
2.3F Use of bond funds
2.3G Deferral or waiver of required improvements
2.3H Approval of construction plans
Article 3.1: General Improvements
3.1 General improvements
Article 3.2. Lots
3.2A Lot arrangement
3.2B Block and lot numbering
3.2C Lot dimensions
3.2D Lot orientation
3.2E Double frontage lots
3.2F Triple frontage lots
3.2G Lot access
3.2H Lot drainage
3.2I Debris and waste
3.2J Soil preservation, final grading and lawn preparation
3.2K Waterbodies and watercourses
3.2L Fencing
3.2M Building setback lines
3.2N Lot addressing
Article 3.3. Streets
3.3A Classification
3.3B General requirements for street design
3.3C Design standards for all public streets
3.3D Excess right-of-way
3.3E Bridges
3.3F Design standards for all private streets
Table 3.3-A: Minimum Design Standards for Streets
Article 3.4. Sidewalks
3.4A Sidewalk location
3.4B Pedestrian/bike path alternative
3.4C Sidewalks and pedestrian/bike path standards
3.4D Pedestrian access easements
Article 3.5. Monumentation
3.5 Monumentation
3.5A Street monuments
3.5B Subdivision boundary monuments
3.5C Lot monuments
Article 3.6. Drainage
3.6A General drainage requirements
3.6B Nature of storm water facilities
3.6C Dedication of drainage easements
3.6D Connection to town drainage utilities
3.6E Maintenance responsibility for detention/retention facilities
Article 3.7. Water Facilities
3.7A General requirements
3.7B Individual wells and central water system
Article 3.8. Sewage Facilities
3.8A General requirements
3.8B Individual disposal system requirements
3.8C Connection to town sanitary sewer system
Article 3.9. Utilities
3.9A Underground utility location required
3.9B Utility easements
Article 3.10. Public Sites
3.10 Public sites
Article 4. Waivers
4.1 General
4.2 Waivers of Subdivision Control Ordinance regulations
4.3 Waiver guidelines
4.4 Procedures for review of waiver requests
4.5 Jurisdiction of waivers
Article V. Vacation of Land in a Plat
5.1 Jurisdiction
5.2 Approval of a vacation of land in a plat by the Plan Commission
5.3 Disapproval of a vacation of land in a plat
5.4 Appeals
Form A: Performance bond
Form B: Irrevocable letter of credit
Form C: Maintenance bond
Form D: Release of performance bond
Form E: Release of irrevocable letter of credit
Form F: Release of maintenance bond
Form G: Letter of compliance
Form H: Completion letter
Form I: Dedication statement
Form J: Surveyor certification
Form K: Plan Commission approval
Form L: Findings of fact