CHAPTER 53: STORMWATER DRAINAGE
Section
General Provisions
53.001   Purpose
53.002   Conflicting ordinances and regulations
53.003   Compliance with other ordinances
53.004   Definitions
53.005   Disclaimer of liability
53.006   Corrective action
53.007   Exempt projects
Storm Water Control Policy and Requirements
53.010   Storm water control policy
53.011   Information requirements
53.012   Topographic and soils maps
53.013   Preliminary drainage plan
53.014   Valley cross section
53.015   Site plan
53.016   Final drainage plans
53.017   Submittal and consideration of plans
Runoff Regulations
53.030   Determination of runoff quantities
53.031   Amount of runoff to be accommodated by various parts of drainage facility
Storm Sewer Design Standards
53.040   Design standards
53.041   Manning equation
53.042   Minimum size
53.043   Grade
53.044   Alignment
53.045   Manholes and inlets
53.046   Inlets
53.047   Workmanship and materials
Open Channel Design Standards
53.060   Design standards
53.061   Manning equation
53.062   Channel cross section and grade
53.063   Side slopes
53.064   Channel stability
53.065   Drainage of waterways
53.066   Appurtenant structures
53.067   Disposition of spoil
53.068   Construction and materials
Stormwater Detention
53.080   Acceptable detention methods
53.081   Design storm
53.082   Allowable release rate
53.083   Drainage system overflow design
53.084   Determination of storage volume - Rational Method
53.085   Determination of storage volume - other methods
53.086   General detention basin design requirements
53.087   Dry bottom basin design requirements
53.088   Wet bottom basin design requirements
53.089   Parking lot storage
53.090   Facility financial responsibilities
53.091   Facility maintenance responsibility
53.092   Inspections
53.093   Corrective measures
53.094   Joint development of control systems
53.095   Installation of control systems
53.096   Detention facilities in floodplains
53.097   Off-site drainage provisions
Other Requirements
53.110   Certification required
53.111   Changes in plan
53.112   Determination of impact drainage areas
53.113   Sump pumps
53.114   Downspouts
53.115   Footing drains
53.116   Basement floor drains
Stormwater Management
53.125   Applicability and exemptions
53.126   Policy on stormwater quality management
53.127   Calculations and design standards and specifications
53.128   Easement requirements
53.129   Inspection, maintenance, recordkeeping and reporting
53.130   Stormwater management/BMP facilities agreement
53.131   Compliance with this subchapter
53.132   Penalties for violation
53.133   Stop work order
53.134   Failure to comply or complete
53.135   Suspension of access to the storm drain system
53.136   Corrective action
Department of Stormwater Management
53.150   Department of Stormwater Management to operate stormwater system
53.151   Purpose and objective
53.152   Definitions
53.153   Board
53.154   Stormwater user fee
53.155   Stormwater user fee establishment procedure
53.156   User fee structure and calculation
53.157   Billings; terms of payment
53.158   Appeals of ERU determinations
53.159   Stormwater Revenue Fund
53.160   Delinquent fees
53.161   Violations and enforcement
53.162   Severability
Stormwater Site Construction and Post-Construction Control
53.175   Purpose and intent
53.176   Definitions
53.177   Applicability
53.178   Responsibility for administration
53.179   Severability
53.180   Ultimate responsibility
53.181   Erosion and sediment control measures
53.182   Stormwater pollution prevention plan
53.183   Design requirements
53.184   Inspections
53.185   General requirements for stormwater quality control
53.186   General requirements for individual building lots within a permitted project
53.187   Enforcement
53.188   Injunctive relief
53.189   Compensatory action
53.190   Violations deemed a public nuisance
53.191   Remedies not exclusive
 
53.999   Penalty