Section
General Provisions
53.001 Purpose
53.002 Conflicting ordinances and regulations
53.003 Compliance with other ordinances
53.004 Definitions
53.005 Disclaimer of liability
53.006 Corrective action
53.007 Exempt projects
Storm Water Control Policy and Requirements
53.010 Storm water control policy
53.011 Information requirements
53.012 Topographic and soils maps
53.013 Preliminary drainage plan
53.014 Valley cross section
53.015 Site plan
53.016 Final drainage plans
53.017 Submittal and consideration of plans
Runoff Regulations
53.030 Determination of runoff quantities
53.031 Amount of runoff to be accommodated by various parts of drainage facility
Storm Sewer Design Standards
53.040 Design standards
53.041 Manning equation
53.042 Minimum size
53.043 Grade
53.044 Alignment
53.045 Manholes and inlets
53.046 Inlets
53.047 Workmanship and materials
Open Channel Design Standards
53.060 Design standards
53.061 Manning equation
53.062 Channel cross section and grade
53.063 Side slopes
53.064 Channel stability
53.065 Drainage of waterways
53.066 Appurtenant structures
53.067 Disposition of spoil
53.068 Construction and materials
Stormwater Detention
53.080 Acceptable detention methods
53.081 Design storm
53.082 Allowable release rate
53.083 Drainage system overflow design
53.084 Determination of storage volume - Rational Method
53.085 Determination of storage volume - other methods
53.086 General detention basin design requirements
53.087 Dry bottom basin design requirements
53.088 Wet bottom basin design requirements
53.089 Parking lot storage
53.090 Facility financial responsibilities
53.091 Facility maintenance responsibility
53.092 Inspections
53.093 Corrective measures
53.094 Joint development of control systems
53.095 Installation of control systems
53.096 Detention facilities in floodplains
53.097 Off-site drainage provisions
Other Requirements
53.110 Certification required
53.111 Changes in plan
53.112 Determination of impact drainage areas
53.113 Sump pumps
53.114 Downspouts
53.115 Footing drains
53.116 Basement floor drains
Stormwater Management
53.125 Applicability and exemptions
53.126 Policy on stormwater quality management
53.127 Calculations and design standards and specifications
53.128 Easement requirements
53.129 Inspection, maintenance, recordkeeping and reporting
53.130 Stormwater management/BMP facilities agreement
53.131 Compliance with this subchapter
53.132 Penalties for violation
53.133 Stop work order
53.134 Failure to comply or complete
53.135 Suspension of access to the storm drain system
53.136 Corrective action
Department of Stormwater Management
53.150 Department of Stormwater Management to operate stormwater system
53.151 Purpose and objective
53.152 Definitions
53.153 Board
53.154 Stormwater user fee
53.155 Stormwater user fee establishment procedure
53.156 User fee structure and calculation
53.157 Billings; terms of payment
53.158 Appeals of ERU determinations
53.159 Stormwater Revenue Fund
53.160 Delinquent fees
53.161 Violations and enforcement
53.162 Severability
Stormwater Site Construction and Post-Construction Control
53.175 Purpose and intent
53.176 Definitions
53.177 Applicability
53.178 Responsibility for administration
53.179 Severability
53.180 Ultimate responsibility
53.181 Erosion and sediment control measures
53.182 Stormwater pollution prevention plan
53.183 Design requirements
53.184 Inspections
53.185 General requirements for stormwater quality control
53.186 General requirements for individual building lots within a permitted project
53.187 Enforcement
53.188 Injunctive relief
53.189 Compensatory action
53.190 Violations deemed a public nuisance
53.191 Remedies not exclusive
53.999 Penalty