(A) The increased stormwater runoff resulting from a proposed development shall be detained on-site by the provisions of appropriate wet or dry bottom reservoirs, by storage on parking lots, or other acceptable techniques. Measures which retard the rate of overland flow and the velocity in runoff channels may also be used to control the runoff rate. Detention basins shall be sized to store excess flows as explained in these standards.
(B) Control devices shall limit the discharge to a rate no greater than that prescribed by these drainage standards.
(Ord. 1999-05, passed 6-8-99)