(A) The allowable release rate of stormwater originating from a proposed development shall not exceed the amount specified in § 53.010.
(B) In the event the natural downstream channel or storm sewer system is inadequate to convey the release rate provided above, then the allowable release rate shall be reduced to that rate permitted by the capacity of the receiving downstream channel or storm sewer system and additional detention as determined by the town shall be required to store that portion of the runoff exceeding the capacity of the receiving sewers or waterways.
(Ord. 1999-05, passed 6-8-99)