Loading...
(a) No benefits will be received for construction work commenced before the effective date of the certificate of eligibility for the work.
(b) Construction may not be commenced until after
(1) submission of preliminary application and any notice required by law
(2) if a building permit is not required by the Department of Buildings, receipt by the Department of Finance of a letter from an architect or engineer licensed in the State of New York, a contractor, the applicant or its authorized representative detailing the project's scope and the estimated date of construction commencement and an affirmation that no permit is required; and
(3) submission of a completed employment report or notice where required.
(a) For tax exemption benefits. For purposes of determining the minimum required expenditure, the exemption base and all other purposes, construction work will be eligible for tax exemption benefits under this program if the work is:
(1) a permanent capital improvement to real property with a useful life of at least three years;
(2) described or integrally related to work described in the approved plans and/or narrative description submitted as part of the application;
(3) performed during the construction period;
(4) not rendered ineligible by any provision of law or these rules or any agreement made as part of the application; and
(5) creates or enhances the value of eligible commercial or industrial property by means of construction of a new building, structure or extension, by the modernization, rehabilitation or alteration of an existing building, by the erection or installation of building systems that are real property or by other physical means.
(b) For tax abatement benefits. To determine the minimum required expenditure, industrial construction work will be eligible for tax abatement benefits under this program if the work is:
(1) a permanent capital improvement to real property having a useful life of at least three years;
(2) described or integrally related to work described in the approved plans and/or narrative description submitted as part of the application;
(3) performed during the construction period; and
(4) not rendered ineligible by any provision of law or these rules or any agreement made as part of the application.
(c) Alterations. Alterations that are eligible construction work for tax exemption benefits or tax abatement benefits include, but are not limited to the following, provided that they are deemed to enhance the value of the property:
(1) alterations that increase the square footage or cubic content of an existing building; and
(2) modernization of core facilities including:
(i) upgrading of electrical and plumbing systems;
(ii) installation of new high-speed elevators and elevator banks;
(iii) renovation or new installation of the "skin" of a structure;
(iv) major upgrading of lobby space;
(v) reconfiguration of multi-tenant floor space to single tenant space;
(vi) installation of central HVAC systems;
(vii) major abatement of asbestos contamination;
(viii) conversion of obsolete office space into functional space; and
(ix) major conversion of a building's use involving structural changes.
(d) Work not deemed to be construction work. Construction work does not include:
(1) Ordinary repairs, replacements or redecoration;
(2) Installation of personal property;
(3) Extension of streets, sewers, water or utility systems to a site not provided with such services; or
(4) Installation of satellite dishes, billboards, or cellular and microwave antennae.
(e) Earthwork or partial demolition. Earthwork or partial demolition may be included in the construction work on a project if:
(1) the earthwork or partial demolition is integrally related to the other construction work on the project and is commenced not more than one year before commencement of the other work and after the date that a preliminary application was filed;
(2) the applicant requests inclusion of the earthwork or partial demolition in the preliminary application or a subsequent notice filed at least 15 business days before the commencement of the earthwork or partial demolition and before a permit for the earthwork or partial demolition is issued; and
(3) for purposes of determining the exemption base only, the Department determines that the earthwork or partial demolition enhances the value of an eligible building.
(f) Notice of completion.
(1) The applicant must notify the Department, in writing, within 60 days of completion of the project. If the project has not been completed by the end of the construction period, the applicant must notify the Department of the extent of construction completed as of that date.
(2) The notice of completion must contain certification by a New York State licensed engineer or architect, or general contractor that the narrative description provided in the final application, as last amended, is an accurate and complete description of the completed project; and
(i) A final certificate of occupancy or any equivalent document issued by the Department of Buildings acknowledging completion of construction; and
(ii) Where no certificate of occupancy is required by the Department of Buildings for construction work described in the narrative description, the date upon which that construction work was completed; or
(iii) Temporary certificate of occupancy plus proof that the applicant has incurred 90 percent of the construction expenses.
(3) The notice of completion must include a detailed itemized statement of the cost of construction. This statement must be certified by a certified public accountant, unless the project cost is less than $1,000,000, in which case the statement may be certified by the applicant.
(g) In the case of an abandoned project, only construction work that is the subject of a newly issued or renewal permit will be eligible for exemption and abatement benefits. Eligible construction for an abandoned project will qualify for benefits only if it is the subject of a preliminary application filed prior to the date on which the new or renewal permit was issued. Where a renovation or new construction for which a building permit was previously issued is abandoned, either a newly issued building permit or the renewal of a previously issued building permit may be deemed a first building permit to determine a certificate of eligibility's effective date. An abandoned project is a project where construction or renovation construction work was commenced by an applicant but has ceased for at least two consecutive years at the time an application is filed for the new project.
Restricted activity means any commercial use of property that is unlawful or a public nuisance, as defined in § 7-703 of the New York City Administrative Code.
(a) A building or part of a building is used for manufacturing where it is used primarily for manufacturing activities. A manufacturing activity involves the assembly of goods or the fabrication or processing of raw materials.
(b) Activities that are not manufacturing, generally.
(1) General management;
(2) Storage, shipping or receiving of materials and finished goods;
(3) Maintenance, repair or construction of real property;
(4) Professional, clerical or information processing activities; and
(5) Buying, selling, leasing or providing goods or services.
(a) Commercial activities include:
(1) Buying, selling, leasing or otherwise providing goods or services.
(2) Operating a transient hotel, except that
(i) a structure or part of any hotel owned or leased by a not-for-profit corporation for the purpose of providing governmentally funded emergency housing is not considered a hotel for purposes of the ICIP; and
(ii) a condominium or timeshare is a transient hotel building for the purposes of the ICIP only where the building, if viewed as a whole and as if it were under single ownership, would qualify as a transient hotel building under the Zoning Resolution. An individual condominium or timeshare unit located in a transient hotel building may qualify for exemption to the extent that the unit is
(A) made available to the general public at large for a minimum of 187 days during the calendar year on terms and dates which are consistent with standards in the hotel industry; and
(B) the unit is not occupied for more than 179 days in any calendar year by:
(I) the owner or any relative of the owner; or
(II) any employee of the owner, or employee of any corporation, partnership, limited liability corporation or other entity owned or controlled by the unit owner.
(3) Operating a theater or other entertainment business.
(4) Manufacturing conducted in a building or individual condominium unit where less than 75 percent of the floor area upon completion of construction is used for manufacturing.
(5) Providing information or services to businesses or investors on a nonprofit, limited profit, or cooperative basis, including operating a stock or commodity exchange, insurance rating bureau, testing service, clearinghouse, wire service, buying service, or private label company or the like.
(6) Computer software development and services, including:
(i) internet and web related activities;
(ii) computer graphics and designs; and
(iii) desk-top publishing.
(7) Other lawful businesses, including governmental or not-for-profit activities.
(8) Repair of equipment and service businesses such as HVAC, plumbing and refrigeration.
(a) In the event that the value of a multi-use property must be apportioned to determine the value attributable to a particular use for any purpose under these rules, including, but not limited to, determining the minimum required expenditure, the assessed value will be apportioned using the same method used by the Department to value property for tax and assessment.
(b) Methods that may be considered.
(1) the land area of each portion;
(2) the market value of the buildings situated on each portion;
(3) the location of each portion on the lot;
(4) the topography of the lot;
(5) zoning and other land use restrictions applicable to the lot or portion thereof;
(6) analyses of income factors relating to each portion;
(7) analyses of cost factors; and
(8) other relevant factors.
Loading...