CHAPTER 920
Stormwater Management and Erosion and Sedimentation Control
920.01    Definitions.
920.02    Administration.
920.03    Purpose.
920.04    Scope.
920.05    Disclaimer of liability.
920.06    Severability.
920.07    Nuisances.
920.08    Responsibility.
920.09    Interpretation of terms and words.
920.10    Reserved.
920.11    General requirements.
920.12    Notification.
920.13    Protection of adajcent properties.
920.14    Compliance with State and Federal regulations.
920.15    Plan criteria.
920.16    Stormwater Pollution Prevention Plan (SWP3) Requirements.
920.17    Stormwater Pollution Prevention Plan (SWP3) Performance Standards.
920.18    Abbreviated Stormwater Pollution Prevention Plan (Abbreviated SWP3) requirements.
920.19    Stormwater peak rate of runoff control methods.
920.20    Permits.
920.21    Stormwater management plans, general requirements.
920.22    Stormwater management plans for commercial and industrial sites.
920.23    Reserved.
920.24    Stormwater Management Plans for Subdivisions.
920.25    Storm water management performance standards.
920.26    Easements.
920.27    City Engineer plan review.
920.28    Inspection and compliance during construction.
920.29    Final inspection approval.
920.30    On-going inspections of permanent structures.
920.31    Variance.
920.32    Performance guarantees.
920.33    Plan review fees.
920.40    Stormwater Utility Fund.
920.41    Stormwater utility rate structure, charges and fees.
920.42    Necessity for charges.
920.43    Right to appeal.
920.44    Service charge collection.
920.45    Adjustments to stormwater service charges.
920.46    Stormwater utility billing and collection.
920.47    Crediting/adjustment mechanism.
920.99    Penalty.
CROSS REFERENCES
      Storm drain conductors and leaders - see OAC 4101:2-51-69
      Illicit discharge and illegal connection control - see S.U. & P.S. Ch. 924