(a) In order to control sediment pollution of water resources, the applicant shall submit a SWP3 in accordance and full compliance with the requirements of the OEPA CGP.
(b) The SWP3 shall include BMPs (SCMs) adequate to prevent pollution of public waters by sediment from accelerated stormwater runoff from development areas.
(c) The SWP3 shall be certified by one of the following: a Professional Engineer, a Registered Surveyor, Certified Professional Erosion and Sediment Control Specialist, or a Registered Landscape Architect.
(d) The SWP3 shall be amended whenever there is a change in design, construction, operation or maintenance, which has a significant effect on the potential for the discharge of pollutants to surface waters of the state or if the SWP3 proves to be ineffective in achieving the general objectives of controlling pollutants in stormwater discharges associated with construction activity.
(e) The SWP3 shall incorporate measures as recommended by the most current online edition of Rainwater and Land Development as published by the Ohio EPA and shall include all information outlined in the Ohio EPA CGP. A copy of the permit requirements (attaching a copy of the current Ohio EPA NPDES Construction General Permit is acceptable).
(Ord. 2019-35. Passed 11-12-19.)