A. Fees:
1. Permits: Application for permit shall be accompanied by the appropriate fee in accordance with the following schedule:
Each sewer connection | $25.00 |
Each water connection | 25.00 |
Water main taps | 25.00 |
Each roof drain run inside of buildings and connected to the village storm drains | 12.00 |
Gas piping | 25.00 |
Lawn sprinkler | 25.00 |
RPZ/cross connection | 25.00 |
2. Water Heaters And Softeners: The fee for the installation, replacement or moving of all domestic hot water heaters, domestic hot water storage tanks, range boilers, and all domestic hot water appliances pertaining to tapping of water mains shall be at the rate of twelve dollars ($12.00) per service. All repair jobs, changing or replacing of each individual plumbing fixture shall be twelve dollars ($12.00) for each opening. A special fee for the installation of water softeners shall be twelve dollars ($12.00) to cover the cost of inspection time.
3. Inspections:
Inspections outside of normal business hours (minimum charge 2 hours) | $50.00 per hour1 |
Reinspection fees assessed under provisions of section 304e and 702c | 50.00 per hour1 |
Inspections for which no fee is specifically indicated (minimum charge 1/2 hour) | 50.00 per hour1 |
Additional plan review required by changes, additions, or revisions to approved plans (minimum charge 1/2 hour) | 50.00 per hour1 |
For use of outside consultants for plan checking and inspections, or both | Actual costs2 |
Notes: 1. Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. 2. Actual costs include administrative and overhead costs. |
(Ord. 1570, 9-17-2012; amd. Ord. 1776, 11-6-2023)